Presentation is loading. Please wait.

Presentation is loading. Please wait.

1 Takehome 1 Econ 140A/240A 2007. 2 Points about the Project Fitted values from Linear probability model, slides 3 & 4 Fitted values from Linear probability.

Similar presentations


Presentation on theme: "1 Takehome 1 Econ 140A/240A 2007. 2 Points about the Project Fitted values from Linear probability model, slides 3 & 4 Fitted values from Linear probability."— Presentation transcript:

1 1 Takehome 1 Econ 140A/240A 2007

2 2 Points about the Project Fitted values from Linear probability model, slides 3 & 4 Fitted values from Linear probability model, slides 3 & 4 Illustrating Student’s t-distribution tests of significance, slides 5 & 6 Illustrating Student’s t-distribution tests of significance, slides 5 & 6 Logit and Probit estimation formulas from EViews help menu, slide 7 (also see Power 14, slides 31-44) Logit and Probit estimation formulas from EViews help menu, slide 7 (also see Power 14, slides 31-44)

3 3

4 4

5 5 tvar=@rtdist(95) tdens=@dtdist(tvar, 95)

6 6 1.98 2.5% 1.66

7 7

8 8 Contingency Table For Bern and Bachelor’s

9 9

10 10

11 11 Senior Genr senior=0*(age 54) Genr senior=0*(age 54)

12 12

13 13

14 14

15 15

16 16

17 17

18 18

19 19

20 20

21 21


Download ppt "1 Takehome 1 Econ 140A/240A 2007. 2 Points about the Project Fitted values from Linear probability model, slides 3 & 4 Fitted values from Linear probability."

Similar presentations


Ads by Google