14 October 2004AME 470 – Team Unum PDR #11 – 18 November 2004 Housing and Packaging Issues Frankie Bott Tim Culbertson Team UNUM
2
14 October 2004AME 470 – Team Unum Rapid-prototyping our Housing Approximately 36 hours per shell $2/hr for machine +$10/hr for Strebinger’s time Total Estimated Cost = $150 Important part of our design (detailed housing design)
3
14 October 2004AME 470 – Team Unum Details of Lower Housing
4
14 October 2004AME 470 – Team Unum Details of Upper Housing
5
14 October 2004AME 470 – Team Unum Outer Details of Housing BUTTONS MICROPROCESSOR AND POWER LCD AIR HOSE
6
14 October 2004AME 470 – Team Unum Final Design Considerations No need for microprocessor/power accessibility Will be battery operated and preprogrammed Ergonomic Design Easier for user to hold and operate Smaller Package Refined design with smaller components, improved portability Improved User Interface Tested user interface will be improved
7
14 October 2004AME 470 – Team Unum Upcoming Activities Assembly Debugging Programming Testing Working Product Questions?