Robert L Renshaw, Jr.. Campus Layout Project Specifications Design a wiring plan and Networking/Internetworking solution for an Ethernet extended star.

Similar presentations


Presentation on theme: "Robert L Renshaw, Jr.. Campus Layout Project Specifications Design a wiring plan and Networking/Internetworking solution for an Ethernet extended star."— Presentation transcript:

1 Robert L Renshaw, Jr.

2

3 Campus Layout Project Specifications Design a wiring plan and Networking/Internetworking solution for an Ethernet extended star topology LAN that uses both fiber- optic and CAT 5 UTP cabling. Project Specifications Design a wiring plan and Networking/Internetworking solution for an Ethernet extended star topology LAN that uses both fiber- optic and CAT 5 UTP cabling. Robert L Renshaw, Jr.

4 Totals MDF 24 Devices 12 Rooms IDF M1 22 Devices 11 Rooms Total 46 Devices 23 Rooms Totals MDF 24 Devices 12 Rooms IDF M1 22 Devices 11 Rooms Total 46 Devices 23 Rooms POP MDF IDF M1 Main Building First FloorCatchment Areas

5 Robert L Renshaw, Jr. IDF M2A IDF M2B TOTALS IDF M2A 20 Devices 10 Rooms IDF M2B 20 Devices 10 Rooms Total 40 Devices 20 Rooms TOTALS IDF M2A 20 Devices 10 Rooms IDF M2B 20 Devices 10 Rooms Total 40 Devices 20 Rooms Main Building Second FloorCatchment Areas

6 Robert L Renshaw, Jr. TOTALS IDF E1 30 Devices Total 30 Devices 15 Rooms TOTALS IDF E1 30 Devices Total 30 Devices 15 Rooms IDF E1 East Building First FloorCatchment Area

7 Robert L Renshaw, Jr. TOTALS IDF E2 30 Devices 15 Rooms TOTALS IDF E2 30 Devices 15 Rooms IDF E2 East Building Second FloorCatchment Area

8 Robert L Renshaw, Jr. TOTALS IDF W1 30 Devices 15 Rooms TOTALS IDF W1 30 Devices 15 Rooms IDF W1 West Building First FloorCatchment Area

9 Robert L Renshaw, Jr. TOTALS IDF W2 28 Devices 14 Rooms TOTALS IDF W2 28 Devices 14 Rooms IDF W2 West Building Second FloorCatchment Area

10 Project Totals Main Building First Floor - 23 Rooms, 46 Computing Devices Second Floor - 20 Rooms, 40 Computing Devices East Building First Floor - 15 Rooms, 30 Computing Devices Second Floor - 15 Rooms, 30 Computing Devices West Building First Floor - 15 Rooms, 30 Computing Devices Second Floor - 14 Rooms, 28 Computing Devices Total 102 Rooms 204 Computing devices Project Totals Main Building First Floor - 23 Rooms, 46 Computing Devices Second Floor - 20 Rooms, 40 Computing Devices East Building First Floor - 15 Rooms, 30 Computing Devices Second Floor - 15 Rooms, 30 Computing Devices West Building First Floor - 15 Rooms, 30 Computing Devices Second Floor - 14 Rooms, 28 Computing Devices Total 102 Rooms 204 Computing devices Robert L Renshaw, Jr.

11 Tyingitall TOGETHER TOGETHER Robert L Renshaw, Jr.

12 Main Building First Floor Cut-Sheet Diagram MDF IDF M1 Robert L Renshaw, Jr. POP

13 MDF Wire Map Robert L Renshaw, Jr.

14 IDF-M1 Wire Map Robert L Renshaw, Jr.

15 Main Building Second Floor Cut-Sheet Diagram IDF M2B IDF M2A Robert L Renshaw, Jr.

16 IDF-M2A Wire Map Robert L Renshaw, Jr.

17 IDF-M2B Wire Map Robert L Renshaw, Jr.

18 East Building First Floor Cut-Sheet Diagram IDF E1 Robert L Renshaw, Jr.

19 IDF-E1 Wire Map Robert L Renshaw, Jr.

20 East Building Second Floor Cut-Sheet Diagram IDF E2 Robert L Renshaw, Jr.

21 IDF-E2 Wire Map Robert L Renshaw, Jr.

22 West Building First Floor Cut-Sheet Diagram IDF W1 Robert L Renshaw, Jr.

23 IDF-W1 Wire Map Robert L Renshaw, Jr.

24 West Building Second Floor Cut-Sheet Diagram IDF W2 Robert L Renshaw, Jr.

25 IDF-W2 Wire Map Robert L Renshaw, Jr.

26 West Building East Building Fiber-Optic Backbone Topology MDF POP IDF E2 IDF W2 IDF W1 IDF M1 IDF M2A IDF M2B IDF E1 Main Building Robert L Renshaw, Jr.

27 MDF Cut-sheet SW-MDF Workgroup Switch To SW-M1 in IDF-M1 To SW-M2A in IDF-M2A To SW-E1 in IDF-E1, SW-W1 in IDF-W1 & POP via Fiber Distribution Panel located in the POP RTR-MDF Router Robert L Renshaw, Jr.

28 IDF-M1 Cut-sheet SW-M1 Workgroup Switch To SW-MDF in MDF Robert L Renshaw, Jr.

29 To SW-M2B in IDF-M2B To RTR-MDF in MDF IDF-M2A Cut-sheet SW-M2A Workgroup Switch Robert L Renshaw, Jr.

30 IDF-M2B Cut-sheet SW-M2B Workgroup Switch To SW-M2A in IDF-M2A Robert L Renshaw, Jr.

31 To SW-E2(W2) in IDF-E2(W2) To Fiber Distribution Panel in POP IDF-E1 & IDF-W1 Cut-sheet SW-E1(W1) Workgroup Switch Robert L Renshaw, Jr.

32 IDF-E2 & IDF-W2 Cut-sheet SW-E2(W2) Workgroup Switch To SW-E1(W1) in IDF-E1(W1) Robert L Renshaw, Jr.

33 To SW-E1 in IDF-E1 To SW-W1 in IDF-W1 To RTR-MDF in MDF POP Cut-sheet Fiber Distribution Panel Robert L Renshaw, Jr.

34 Backbone Cabling Wire Map Robert L Renshaw, Jr.

35 Equipment & Pricing Equipment & Pricing Robert L Renshaw, Jr.

36 MDF Equipment Rack Fiber-Optic Distribution Panel Patch Panels (UTP) Router (with Fiber-Optic Module) Workgroup Switch (SW-MDF) Robert L Renshaw, Jr.

37 POP Equipment Rack Fiber-Optic Distribution Panel (Horizontal Cross Connect) Fiber-Optic Distribution Panel (Main Cross Connect) Robert L Renshaw, Jr.

38 IDF Equipment Racks Patch Panels (UTP) Fiber-Optic Distribution Panel Workgroup Switches (SW-IDF-M1) (SW-IDF-M2A) (SW-IDF-M2B) (SW-IDF-E1) (SW-IDF-E2) (SW-IDF-W1) (SW-IDF-W2) Robert L Renshaw, Jr.

39 Cisco 7505 Interface Processor (Modular Router) Robert L Renshaw, Jr.

40 Cisco 7505 Router Modules 10BaseT Multi-Mode Fiber Single-Mode Fiber Robert L Renshaw, Jr.

41 Workgroup Switches Catalyst 3500 XL Series Robert L Renshaw, Jr.

42 Patch Panels 48 port Fiber Distribution(5.25"x19") uses 3 rack spaces CAT 5 Patch Panels Robert L Renshaw, Jr.

43 Project Expenses Robert L Renshaw, Jr.

44 Designed and presented by: Robert L Renshaw, Jr.