David Saenz Far Experimental Hall - Hutchessaenzd@slac.stanford.edu June 17, 2008 1 Far Experimental Hall - Hutches Scope Budget Schedule
2
David Saenz Far Experimental Hall - Hutchessaenzd@slac.stanford.edu June 17, 2008 2 SLAC Site Plan SLAC Main Gate MMF Research Yard Pep Ring Road LCLS General Work Boundary Sector 25 Sector 20 Upstream B028 B751 FEH
3
David Saenz Far Experimental Hall - Hutchessaenzd@slac.stanford.edu June 17, 2008 3 FEH Location FEH X-RAY TUNNEL ACCESS TUNNEL
4
David Saenz Far Experimental Hall - Hutchessaenzd@slac.stanford.edu June 17, 2008 4
5
David Saenz Far Experimental Hall - Hutchessaenzd@slac.stanford.edu June 17, 2008 5 Far Hall rebar lattice Tunnel construction complete 25 April 2008
6
David Saenz Far Experimental Hall - Hutchessaenzd@slac.stanford.edu June 17, 2008 6 Far Experimental Hall south rib Installing re-bar in the Far Experimental Hall
7
David Saenz Far Experimental Hall - Hutchessaenzd@slac.stanford.edu June 17, 2008 7 Scope Cavern space is well defined as part of current civil construction preformed by TCCo Scheduled Beneficial Occupancy date is Aug 08 Issue For Construction (IFC) set had sufficient spatial and utility capacities to support future hutches Draft requirements of Room Data Sheets (RDS) have been provided for hutches Held meeting 12/07 to discuss further hutch program requirements Data received to date is at early stage of determining final scope to support scientific mission needs Need to advance quickly
8
David Saenz Far Experimental Hall - Hutchessaenzd@slac.stanford.edu June 17, 2008 8 Scope Per IFC RATED WALL/RADITION BARRIER ACCESS TUNNEL Denotes hutches (not a part of current construction)
9
David Saenz Far Experimental Hall - Hutchessaenzd@slac.stanford.edu June 17, 2008 9 Recent FEH Changes Monolithic single pour floor for entire FEH and to include 50 meter at the east end of X- Ray tunnel Relocation of wall (fire rated, radiation barrier) to inside X-Ray tunnel Relocation of pipes and ducting for exhaust of X-Ray tunnel
10
David Saenz Far Experimental Hall - Hutchessaenzd@slac.stanford.edu June 17, 2008 10 FEH Location FEH X-RAY TUNNEL ACCESS TUNNEL RATED WALL RADIATION BARRIER
11
David Saenz Far Experimental Hall - Hutchessaenzd@slac.stanford.edu June 17, 2008 11 Hutch #4 & #5 Layout-Aug 07 Hutch #4 Hutch #6? Hutch #5 Denotes ancillary space for hutches #4 and #5
12
David Saenz Far Experimental Hall - Hutchessaenzd@slac.stanford.edu June 17, 2008 12 WBS for FEH Hutches has a TPC of $2.82M EDI at $.24M Independent cost estimate Title I/II design Construction at $2.58M Title III Budget Construction cost estimate as provided by JE, based on Room Data Sheets, Rev 0 include the following: Escalation (thru July 09), sales tax, below grade factor (difficulty factor), oh&p, bonding, general conditions, hutch doors, 1/8” lead lined walls and ceilings, 1 ton hoist, mechanical and electrical
13
David Saenz Far Experimental Hall - Hutchessaenzd@slac.stanford.edu June 17, 2008 13 FEH Hutches 4 and 5 Title I Design (present – end of 6/08) Title II Procurement (7/08) Design (8/08 – 11/08) Title III Procurement (11/08 – 12/08) Construction (1/09 – 7/09) Construction Complete July 09 Beneficial Occupancy July 09 Project Complete Aug 09 Schedule
14
David Saenz Far Experimental Hall - Hutchessaenzd@slac.stanford.edu June 17, 2008 14 Next 6 Months Complete Title I effort (in house resources) 6/08 Procurement activities for Title II 7/08 Commence Title II design 8/08 Independent cost estimate 10/08 Complete Title II 11/08 Procurement activities for Construction 11/08 Construction start 1/09
15
David Saenz Far Experimental Hall - Hutchessaenzd@slac.stanford.edu June 17, 2008 15 Summary Cavern support space as currently being constructed is well defined Scheduled date for Beneficial Occupancy Aug 08 is reasonable Hutch requirements need to be solidified no later than June 30, 08 Rad Physics requirements play major role Need liaison between CF and LUSI
16
David Saenz Far Experimental Hall - Hutchessaenzd@slac.stanford.edu June 17, 2008 16 End of presentation
17
David Saenz Far Experimental Hall - Hutchessaenzd@slac.stanford.edu June 17, 2008 17 Scope in TCCo Contract Power Lighting and power FEH cavern Capacity for two independent panels in each hutch Cable trays at perimeter of FEH Welding outlet, 480 volts, 3 ph. Mechanical FEH cavern: conditioned space Restrooms including showers
18
David Saenz Far Experimental Hall - Hutchessaenzd@slac.stanford.edu June 17, 2008 18 Mechanical Drainage (3 sump pumps inc. access tunnel) and SW piping to sanitary waste system through FEH access tunnel Outside air capacity for three future hutches Compressed air (from CUP) south wall (stub outs w/valves) Process cooling water (PCW) for Hutches and work area- 68°F, 10GPM/ea Scope in TCCo Contract
19
David Saenz Far Experimental Hall - Hutchessaenzd@slac.stanford.edu June 17, 2008 19 Utility Yard at Entrance AT FEH ACCESS TUNNEL TRANSFORMER EXHAUST FANS CROSS SECTION AT THE ENTRANCE OF ACCESS TUNNEL
20
David Saenz Far Experimental Hall - Hutchessaenzd@slac.stanford.edu June 17, 2008 20 Room Data Sheets (RDS) Preliminary “draft” for hutches #4 and 5 Requirements for: Power (clean and dirty) HVAC, 72 °F, ± 1°F, RH 45% ± 10% Exhaust 1 ton crane Fire protection/fire alarm system Network and phone systems Cable trays and penetrations thru walls Lead lined walls
21
David Saenz Far Experimental Hall - Hutchessaenzd@slac.stanford.edu June 17, 2008 21 Hutch #4 Utilities Requirements