Update on GEM-based DHCAL for SiD Andy White For GEM/DHCAL Group September 21, 2005.

Similar presentations


Presentation on theme: "Update on GEM-based DHCAL for SiD Andy White For GEM/DHCAL Group September 21, 2005."— Presentation transcript:

1 Update on GEM-based DHCAL for SiD Andy White For GEM/DHCAL Group September 21, 2005

2 - We have received new 30cm x 30cm foils from 3M Corporation - Some initial problems with surface – mositure trapped -> now cured - HV (~400V) tests on all 12 strips/foil - Now tooling up to build 5 30cm x 30cm chambers - Foils also being sent to 5 other institutions in U.S., Canada, China, Korea for evaluation. - 20 QPA02-based preamp cards made at Fermilab. Recent activities

3 Fermilab beam chamber DGEM Cosmic stack using Double GEM counters

4 (10 x 10) – 4 active area = 96 channels Trace edge connector -> Fermilab 32 ch board 305mm x 305mm layer Disc/DAQ under design by U.W.

5 3M GEM foil design HV tabs to be longer

6 First 30cm x 30cm 3M GEM foils

7

8 Section of 30cm x 30cm 3M GEM Foil

9 A piece of fiber inside the hole on uncoated GEM

10

11 Tooling for mounting GEM foils on G10 frames

12 G10 Frame 30cm x 30cm

13