D-ES-x-xxx Rev A 5/17/10 1 of 21 (Title) – Final Design Review (FDR) (name) PI (name) PA Date of Review First Use Acknowledgements Image of diagnostic LLE Will Complete after the review Enter number of pages – required for PDM submittal Update logo Establish Key Contacts Update Date from: /View/Master/Slide Master Edits are made on the slide master accessed via: /View/Master/Slide
2
D-ES-x-xxx Rev A 5/17/10 2 of 21 Overview - Motivation -Summarize Scope -Summarize Motivation Campaign Details: EP or Omega Or Joint Shot?; Campaign Type? Side Lighter/ Back Lighter? What TIM’s or Fixed? High Xrays, High Yield? High EMP?, Tritium?
3
D-ES-x-xxx Rev A 5/17/10 3 of 21 Requirements List Requirements Mechanical - Positioning Performance Accuracy Show/Validate that the requirements have been met
4
D-ES-x-xxx Rev A 5/17/10 4 of 21 Target Diagnostic Check List (Diagnostics Only) – Disclose Equipment Requirements Double Click and Edit; Items marked “Y” should show up on a slide in the presentation
5
D-ES-x-xxx Rev A 5/17/10 5 of 21 Design Concepts 1) Present Design – LLE will ask questions on the following topics (be prepared): Weight Rigging – CG – Handles that straddle CG Vacuum/optical Compatible materials FEA Safety Note must be in LLE ME hands prior to FDR 2) “Target Diagnostic Check List” Cover Items checked “Y” 3) Issues Options Trade offs
6
D-ES-x-xxx Rev A 5/17/10 6 of 21 Beam Envelope – Clearances – Space Envelope Step File must be sent to LLE 1 week prior to the review for beam clearance and space envelope checks
7
D-ES-x-xxx Rev A 5/17/10 7 of 21 P &ID – Tutorial Located on LLE Web Site 240 psi pump
8
D-ES-x-xxx Rev A 5/17/10 8 of 21 System Level Cabling Diagram – Shows system interconnects
9
D-ES-x-xxx Rev A 5/17/10 9 of 21 Detail Electronic Design – (show wire numbers/cabinets) Need to show cable and wire numbers – cable connections is a significant cause of shot delays
10
D-ES-x-xxx Rev A 5/17/10 10 of 21 Space Claim – Floor Plan Temporary Scopes and PS’s
11
D-ES-x-xxx Rev A 5/17/10 11 of 21 Operations Installation steps Setup/Alignment Overview Typical Shot – Steps to Service diagnostic SRF Definition Status of Procedure –install, Alignment and shot operations draft procedure must be submitted to LLE prior to FDR
12
D-ES-x-xxx Rev A 5/17/10 12 of 21 CDR Action Items Copy CDR Action Items Table Here; Review after the design presentation; this helps LLE to understand the items are addressed
13
D-ES-x-xxx Rev A 5/17/10 13 of 21 Viewing/Editing SRA – 4)This button allows the SRA to be viewed/printed/saved – Save the SRA 2) Select SRA 1) Click on your project from the project status summary to get to the LLE Project Milestones page 3)Edit then Select Save & Print 5)Take a screen shot of the SRA and place in presentation
14
D-ES-x-xxx Rev A 5/17/10 14 of 21 SRA
15
D-ES-x-xxx Rev A 5/17/10 15 of 21 FMEA – Each Entry on SRA requires an Entry on FMEA; additional entries can be made Double Click & Edit Enter the Line #’s into the SRA Form (Associated Risk) There must be a change in one of these two columns (Before vs After)
16
D-ES-x-xxx Rev A 5/17/10 16 of 21 Viewing EQC 2) Select EQC 1) Click on your project from the project status summary to get to the LLE Project Milestones page 3) Select “Save & Print Landscape”; Take a screen shot of each page and put in presentation (two slides)
17
D-ES-x-xxx Rev A 5/17/10 17 of 21 EQC
18
D-ES-x-xxx Rev A 5/17/10 18 of 21 EQC
19
D-ES-x-xxx Rev A 5/17/10 19 of 21 Issues - Risks
20
D-ES-x-xxx Rev A 5/17/10 20 of 21 Who does What - Assignments Resources – Spares - Maintenance
21
D-ES-x-xxx Rev A 5/17/10 21 of 21 Budget (LLE Reviews Only)