MICE Absorber Test Cryostat Plan-II S. Ishimoto KEK MICE-AFC Phone Meeting, Aug-27, ‘04
2
MICE Absorber Test Process KEK (1) Pressure Test at R.T. with Dummy Windows (2) Pressure Test by G-He at 20 K with Dummy Windows US/FNAL (3) Pressure Test at R.T. RAL (6) Pressure Test at R.T. (7) Cooling Test by G-He (8) Cooling Test by L-H2 KEK (or FNAL) (4) Pressure Test at R.T. with Windows (5) Pressure Test by G-He at 20K with Windows (2)&(5) Needs Test Cryostat at KEK (7)&(8) Needs Test Cryostat at RAL?
3
MICE Absorber (Latest Drawing)
4
L-H2 Level SensorStay Off Lines
5
MICE Absorber Test Cryostat (Plan-I) To order this cryostat, we have to fix the detail design of absorber & cryostat.
6
MICE Absorber Test Cryostat (Plan-II) Present 300 absorber test MICE absorber test Thermometer/level sensor calibration by Cryocooler (Absorber test with Cryocooler) Test Item
7
Plan-II with MICE Absorber
9
Plan-II with Present Absorber