Presentation is loading. Please wait.

Presentation is loading. Please wait.

Michael Scharfenstein FAC 24 - 28 October 2005 1 LCLS Environment, Safety & Health Michael Scharfenstein ES&H Coordinator.

Similar presentations


Presentation on theme: "Michael Scharfenstein FAC 24 - 28 October 2005 1 LCLS Environment, Safety & Health Michael Scharfenstein ES&H Coordinator."— Presentation transcript:

1 Michael Scharfenstein FAC Reviewscharf@slac.stanford.edu 24 - 28 October 2005 1 LCLS Environment, Safety & Health Michael Scharfenstein ES&H Coordinator

2 Michael Scharfenstein FAC Reviewscharf@slac.stanford.edu 24 - 28 October 2005 2 Emergency Information Fire or other emergency evacuation Follow contact out of building to assembly area Earthquake Duck, cover, and hold position until shaking stops evacuate building to assembly area stay away from windows, downed power lines In the event of an emergency dial 911 or 9-911 Cells are routed to CHP dispatch SLAC phone outside line access – dial 9 first

3 Michael Scharfenstein FAC Reviewscharf@slac.stanford.edu 24 - 28 October 2005 3 Past Review Recommendations Establish a Project Safety Program Preparation for Readiness Review Define Equipment Safety Criteria

4 Michael Scharfenstein FAC Reviewscharf@slac.stanford.edu 24 - 28 October 2005 4 Project Safety Program LCLS Construction Safety Program July 2005 Directorate ISMS Plan August 2005 Preliminary Fire Hazard Analysis September 2005 CM/GC Selection

5 Michael Scharfenstein FAC Reviewscharf@slac.stanford.edu 24 - 28 October 2005 5 Preparation for Readiness Review Reviews are Identified in P3 Schedule Safety issues to be addressed in technical reviews SLAC Safety Oversight Committee Preliminary Safety Assessment Document Required for CD-3 (February 2006) LCLS to be included in revised SLAC Linac SAD Information compiled from technical reviews

6 Michael Scharfenstein FAC Reviewscharf@slac.stanford.edu 24 - 28 October 2005 6 Equipment Safety Criteria Process based on WBS level Requirement, Specification and Interface Documents Engineering Specification Document Cable Specification Document

7 Michael Scharfenstein FAC Reviewscharf@slac.stanford.edu 24 - 28 October 2005 7 Recent Accomplishments Construction underway Effective implementation of safety program Contractor Safety Orientation Successful ISMS Review Construction sites held out as example of good implementation


Download ppt "Michael Scharfenstein FAC 24 - 28 October 2005 1 LCLS Environment, Safety & Health Michael Scharfenstein ES&H Coordinator."

Similar presentations


Ads by Google