Presentation is loading. Please wait.

Presentation is loading. Please wait.

SUNY GENERAL EDUCATION ASSESSMENT CONFERENCE November 13-14 th 2003, Crowne Plaza Hotel, Albany, New York Creating a Comprehensive General Education Assessment.

Similar presentations


Presentation on theme: "SUNY GENERAL EDUCATION ASSESSMENT CONFERENCE November 13-14 th 2003, Crowne Plaza Hotel, Albany, New York Creating a Comprehensive General Education Assessment."— Presentation transcript:

1 SUNY GENERAL EDUCATION ASSESSMENT CONFERENCE November 13-14 th 2003, Crowne Plaza Hotel, Albany, New York Creating a Comprehensive General Education Assessment Model: A Call for Executive Support, Collaboration of Key Stakeholders, and Triangulation of Measures by Dr. Shawn Van Etten, Director of Institutional Research & Assessment Dr. Mark Prus, Dean, College of Arts & Sciences State University of New York, College at Cortland

2 Cortland General Education Assessment: A Solid Foundation *Fall 1999: Formal & Comprehensive Assessment of 8 Cortland General Education Categories & Skill Areas THE CORTLAND ASSESSMENT PROCESS 1.President, Provost, Deans, Faculty Senate, GE Committee, Faculty, and Institutional Research Supported GE Assessment; 2.Faculty Senate Endorsed Policy Guiding GE Assessment ; 1.Faculty Teaching Courses in Each GE Category Requested to Develop Essays Questions;

3 The Cortland Assessment Process Continued 4.GE Committee & Institutional Research Reviewed Items & Selected 1 Item Per Category (Now 2 Items) – Items Best Representing the Goals & Objectives of the Category; 5.Standardized Administration Procedures Developed for ‘Take-Home’ vs ‘In-Class’ and ‘No-Credit Assignment’ vs ‘Credit Assignment’ (Now Recommended ‘In-Class’ and ‘Credit Assignment’); 6.Faculty Trained and Scored Essays Using Two Rubrics (1 General; 1 Specific); Stipend Awarded; 7.Institutional Research Disseminated Results for Formative & Summative Purposes.

4 Cortland GE Strengths & Voiced Concerns STRENGTHS A.Executive Administrators – Provided: (1) Experts to Support Efforts and Training; (2) Time to Develop; (3) Funding; and (4) Campus-Wide Encouragement. B.Faculty, Faculty Senate, GE Committee, Institutional Research – Collaborated on: (1) Instrument & Rubric Development; (2) Implementation Procedures; and (3) Dissemination of Results. VOICED CONCERNS A.Sampled Faculty Need Ample Time to Build into Syllabi; B.Assessments Should Be Administered During Class Time; C.Students Should Be Assigned Grades for Essays; and D.Assessments Should Be Multidimensional & Automated When Possible.

5 ISSUES TO CONSIDER A.Faculty Vested in Cortland GE – Resolution of Cortland & SUNY GE’s; B.Stakeholder Awareness of SUNY GE Knowledge & Skill Area Requirements; C.Instrument & Rubric Modification/Development to Assess SUNY GE Goals; D.Timeliness: A Resolution of Administrator and Faculty Timelines. THE TRANSITION PROCESS A.Key Stakeholder Informational Meetings; B.Quasi-Seamless Cortland and SUNY GE Programs; C.GE Committee, Institutional Research, & Faculty Collaborate to Modify Tools; D.Timelines Developed and Implemented. Cortland GE to SUNY GE: The Transition

6 Triangulation of Results -The development of a comprehensive, valid, and reliable assessment system necessitates triangulation of information across measures, participants, and researchers; without triangulation we base important and often costly decisions on results that may lack both reliability and validity. -SUNY Cortland is in the process of moving from a unidimensional to multidimensional assessment approach, an approach that tries to best represent the various modalities through which students acquire and represent knowledge (e.g., Foreign Language Assessment)


Download ppt "SUNY GENERAL EDUCATION ASSESSMENT CONFERENCE November 13-14 th 2003, Crowne Plaza Hotel, Albany, New York Creating a Comprehensive General Education Assessment."

Similar presentations


Ads by Google