Tina design review Main design decisions. Top level modules. Responsibilities. Phases A & B. Test plan. Time table.

Similar presentations


Presentation on theme: "Tina design review Main design decisions. Top level modules. Responsibilities. Phases A & B. Test plan. Time table."— Presentation transcript:

1

2 Tina design review Main design decisions. Top level modules. Responsibilities. Phases A & B. Test plan. Time table.

3 Main design decisions Implementation language. Target platform. Database. User interface. Tools.

4 Top level modules Database. In memory cache. Engine. User interface. – For each module: Role. Classes. Sequences.

5 Responsibilities A Idan – Updating the requirements document. – Use cases - design document. – Tina elements. – Tina Cache. – Help. – Testing.

6 Responsibilities B Amit – Overall view – design document. – Tina GUI. – Testing. – Multilanguage support. – Drag & Drop.

7 Responsibilities C Itamar – Tina wrappers. – Tina Database. – Integration. – Import Calculation parameters. – Printing hard copies of Tina data. – Graphs display.

8 Responsibilities D Yoav – Sequences – design document. – Tina Engine. – Install Shield. – Add calculation parameters. – Integration.

9 Phase A All wrappers. All Tina Elements. Tina Database. GUI. Tina Engine.

10 Phase B Import of the Calculation parameters. Drag & Drop. Help. Install shield. Printing. Graphs. Add calculation parameters dynamically. Multilanguage support.

11 Test plan Module tests. – DB tests. – Cache tests. – Engine tests. – UI tests. 2 - Module interfaces. – UI – Cache tests. – UI – Engine tests. – Cache – DB tests. – Engine – DB tests. 3 – Module sequences. – UI – Cache –DB tests. – UI – Engine –DB tests. Full integration checks.

12 Time table A

13 Time table B

14 Time table C