Exploring Latency Constraints of Co-Processing Boards Grant Jenks UCLA
2
Original Plan ◦ What I had planned to do. Accomplishments ◦ What I actually did. Problems ◦ What happened. Revised Plan ◦ What’s the new plan.
3
Analyze and Synthesize ◦ First quarter: Analysis Develop the test platform. Test the different classes of programs on the platform and collect a lot of data. ◦ Second quarter: Synthesis From the data, determine that “sweet spot.” Based on analysis, determine a way to validate the initial tests using existing hardware or FPGAs. If validation simply cannot happen then more fully develop why this is so.
4
Vtune Tests ◦ Dozens of different processor loads recorded. This data can demonstrate a strong need for another processor. Classic PTLsim Tests (32-bit) ◦ Dozens of different programs with various parameters were run to determine optimal performance in a one processor and one program environment. This data can demonstrate the optimal performance of a program with no contention for memory or processing. ◦ Analyzed code and evaluated how to change it so that the proper simulation environment can be created. Full Simulation PTLsim/XEN (64-bit) ◦ Modified kernel code and patched kernels to allow for PTLsim enhancements. ◦ Gained lots of experience in systems administration tasks and operating system’s practicals. ◦ Tried dozens of different configurations trying to get this to work.
5
Hardware Issues ◦ Haven’t been able to acquire a 64-bit computer with virtualization technology support. ◦ SATA Hard Drive failed in test machine. PTLsim/XEN ◦ Code is difficult to change. ◦ Systems work requires tons of time while juggling operating systems. ◦ XEN technologies are still fairly new and not well supported. ◦ Little help in general with XEN technologies. Vtune ◦ Reproducibility is sometimes challenging. Bad Luck ◦ Nothing works “out-of-the-box” Scripts have been tweaked to make builds and runs work properly.
6
Produce working simulation environment under PTLsim/XEN. Run a wide variety of tests in the simulation environment under different hardware scenarios. ◦ The goal is to get at least five different software scenarios tested under at least five different hardware simulations. Determine the “sweet spot” for a hardware implementation of a co-processing board. ◦ Go back and run more tests in Classic PTLsim or Vtune if necessary. Time permitting, validate “sweet spot” hardware implementation with real-world co-processing board.
7
Original plan did not properly estimate the time it would take to set up the simulation environment. Data collected can establish the need for more processing power and show optimal program execution. There’s a lot of momentum going into the second quarter but it is questionable whether the tests can be verified.