Presentation is loading. Please wait.

Presentation is loading. Please wait.

Small Wheel Phase 1.9 Nigel Nation 1 November 2006.

Similar presentations


Presentation on theme: "Small Wheel Phase 1.9 Nigel Nation 1 November 2006."— Presentation transcript:

1 Small Wheel Phase 1.9 Nigel Nation 1 November 2006

2 Use of Space(s) Jura Side Barracks 8 EIS.1Cxx chambers are on dollies 4 are de-boxed 4 have been photgrametried and calibrated 8 need phase 1.9 Saleve Large Sector 8 EIS.2Cxx chambers are on dollies Need to access the use of verticalizer and height of boxes Can NOT do EIS.1xxx, EIL.1xxx nor EIL.2xxx because of box construction Possibility of gantry crane in EIL.4xxx area (but concrete blocks have to be moved)

3 Chamber De-boxing Use of Harvard lifting tool to remove chamber from box Detailed procedure for how to do this Train people to use the tool

4 Phase 1.9

5 Gas system for EI Chambers P LM 1 ML 2

6 Chamber on Rotator Use of rotator and cart. Detailed procedure for connecting rotator to chamber Chamber can now be photogrametried

7 Photogrametry Matt, Dan and Christoph photogrametried 4 EIS.1Cxx chambers Matt calibrated these One mare cart available enabling 2 chambers to be photogrametried


Download ppt "Small Wheel Phase 1.9 Nigel Nation 1 November 2006."

Similar presentations


Ads by Google