Auburn University Facilities Prioritization Process Each college will submit up to five projects annually – Ten this first year Projects must cost $50,000.00 or more Committee Chaired by Provost will rank based on point system Projects will be funded based on ranking and available funds Unfunded projects can roll to next year
2
Auburn University Libraries 2009/2010 Building Plan Phase II Re-carpet - $600,000.00 Electrical Upgrade - $300,000.00 Upgrade Smoke Detectors and PA System - $350,000.00 Complete re-carpeting of 3 rd, 4 th, Ground, and Tech Svcs Install approx 600 electrical outlets throughout study spaces of Library Replace current detectors w/addressable detectors and new PA system
3
Offsite Storage Information/Learning Commons - $300,000.00 (EBSCO/Lib) Electrical Upgrade – Server Room - $75,000.00 Provide approx. 10,000 sq ft of suitable offsite storage Provide a dynamic, comfortable learning environment conducive to productivity yet flexible enough to meet staff and user needs Connect server room to backup generator
4
Special Collections HVAC Upgrade – $250,000.00 Multipurpose Computer Area - $120,000.00 Faculty Office Space – $300,000.00 Signage - $120,000.00 Upgrade HVAC to provide constant temp and humid controls at recommended levels Convert an area on 1 st floor to computing space similar to Internet Café Upgrade faculty office space to include better privacy, more space and better sound control Update adaptable signage throughout Library
Similar presentations
© 2025 SlidePlayer.com. Inc.
All rights reserved.