Status of the SPECTRAP project HITRAP meeting 27 September 2007 by Danyal Winters
2
August 2007
4
turbo pump rotary pump water cooler stolen power
5
August / September 2007
6
September 2007
8
August 2007 September 2007
9
General assembling and vacuum – Javier Cerillo Moreno (summer student)
10
General assembling and vacuum
13
Ionisation gauge (10E-3 to 10E-11 mbar) Pirani gauge (10E+3 to 10E-3 mbar)
14
General assembling and vacuum
15
Computer simulations SIMION version 7 (SPECTRAP beamline)
16
Computer simulations (Ar + sputter gun)
18
Computer simulations Initial Energy (keV) Einzel Lens Potential (kV) Upper Bender Electrode (kV) Lower Bender Electrode (kV) 0.50.10.35-0.35 0.90.310.65-0.65 1.20.450.8-0.8
19
Ion generation and measurements
21
Results
22
The plans for the nexts few months: - power transformers (2x 5 kW) - improve beamline vacuum (cryo pumps) - do more tests with sputter gun and beamline - tests with the MEVVA ion source - platform safety issues (cage) - stairs from re-injection channel to platform - solve problems with superconducting magnet - next SPECTRAP meeting 23-11-2007 (with David Church Texas A&M University)