MICE Video Meeting, 10 Jan 081 Spectrometer Magnet Progress Michael A. Green Lawrence Berkeley Laboratory.

Similar presentations


Presentation on theme: "MICE Video Meeting, 10 Jan 081 Spectrometer Magnet Progress Michael A. Green Lawrence Berkeley Laboratory."— Presentation transcript:

1 MICE Video Meeting, 10 Jan 081 Spectrometer Magnet Progress Michael A. Green Lawrence Berkeley Laboratory

2 MICE Video Meeting, 10 Jan 082 Tracker Magnet Vacuum Vessel Fabrication Late December 2007

3 MICE Video Meeting, 10 Jan 083 Cold Mass Assembly for Magnet 1 after Welding and Vacuum Leak Check Early December 2007

4 MICE Video Meeting, 10 Jan 084 The First Magnet 70 K Aluminum Shield With MLI on its Outside Early January 2008

5 MICE Video Meeting, 10 Jan 085 The magnet cold mass was completed in early December. The cryostat and shield shells were completed in the middle of December. The cryostat vacuum vessel was completed in December. The cold mass supports, lead assembly and cold mass piping assembly were completed before Christmas. The magnet Stand was completed in late December. Fit up of the cold mass supports into the cryostat and shields will be finished by January 18th. The magnet fabrication will be finished by February 1. After testing the magnet will be shipped to Fermi Lab in late February. Progress on Tracker Magnet 1

6 MICE Video Meeting, 10 Jan 086 Progress on the the Second Tracker Magnet Early December 2007 The magnet coil winding was completed in mid November. The fabrication of cryostat and shield shells is proceeding. Electrical leads, cold mass supports, and most of the other magnet parts are ready for assembly. Magnet assembly will start in February. The magnet fabrication will be finished by May 1 The magnet will be shipped to Fermi Lab in May.