Presentation is loading. Please wait.

Presentation is loading. Please wait.

April 8, 2005 ANITA Collaboration Meeting/UCI/Marc Rosen 1 EMI AND THERMAL ISSUES THE MAIN ANITA EMI ENCLOSURE AND THE SIP EMI ENCLOSURE HAVE SIMILAR CONSTRUCTION,

Similar presentations


Presentation on theme: "April 8, 2005 ANITA Collaboration Meeting/UCI/Marc Rosen 1 EMI AND THERMAL ISSUES THE MAIN ANITA EMI ENCLOSURE AND THE SIP EMI ENCLOSURE HAVE SIMILAR CONSTRUCTION,"— Presentation transcript:

1 April 8, 2005 ANITA Collaboration Meeting/UCI/Marc Rosen 1 EMI AND THERMAL ISSUES THE MAIN ANITA EMI ENCLOSURE AND THE SIP EMI ENCLOSURE HAVE SIMILAR CONSTRUCTION, EXCEPT FOR THE THERMAL RADIATOR PLATE FRAME CONSTRUCTION IS WELDED 316L SS, FOLLOWED BY COPPER PLATING (THE ANITA RADIATOR IS AL-6061 AND WILL ALSO BE COPPER PLATED) SIDE PANELS ARE COPPER AND HELD IN PLACE VIA BLIND CAPTIVE NUTS SIDE PANELS ARE REMOVABLE AND WILL ALSO PROVIDE FOR CONNECTORS EMI GASKETS WILL BE USED BETWEEN COPPER PANELS AND FRAME THE CABLING PLANS NEED TO FINALIZED FOR BOTH ANITA AND THE SIP

2 April 8, 2005 ANITA Collaboration Meeting/UCI/Marc Rosen 2 EMI AND THERMAL ISSUES CONFIGURATION FOR PALESTINE TEST (NO EMI CONCERNS)

3 April 8, 2005 ANITA Collaboration Meeting/UCI/Marc Rosen 3 EMI AND THERMAL ISSUES

4 April 8, 2005 ANITA Collaboration Meeting/UCI/Marc Rosen 4 EMI AND THERMAL ISSUES

5 April 8, 2005 ANITA Collaboration Meeting/UCI/Marc Rosen 5 EMI AND THERMAL ISSUES SURF-PRO HEATSINK FOR UM TV TEST LESSONS LEARNED: TOO MUCH TIME TOO EXPENSIVE TOO PRECISE FOR PCB

6 April 8, 2005 ANITA Collaboration Meeting/UCI/Marc Rosen 6 EMI AND THERMAL ISSUES SURF-V1 HEATSINK FOR TX TV TEST LESSONS LEARNED: QUICK DESIGN AND FABRICATION LOWER COST LOW MASS, MAY REQUIRE FABRICATION IN MATERIAL WITH BETTER THERMAL CONDUCTIVITY


Download ppt "April 8, 2005 ANITA Collaboration Meeting/UCI/Marc Rosen 1 EMI AND THERMAL ISSUES THE MAIN ANITA EMI ENCLOSURE AND THE SIP EMI ENCLOSURE HAVE SIMILAR CONSTRUCTION,"

Similar presentations


Ads by Google