Download presentation
Presentation is loading. Please wait.
1
Domino House Week 4 of 6 EGR 105 Project Fall 2002
2
Final Design Requirements Architect: –300-350 dom internal area –5 interior rooms Openings into interior room of 2-4 lyns No interior doors –Due to addition of (plain) interior walls: Blankness increase to 60-70% is okay Minimum Blankness Dispersion Ratio is dropped to 65% I/E Ratio > 1.25
3
Final Design Requirements Project Manager: –Stronger, more expensive anchors are available (see next slide) –Change in time estimating: 3 wex to position a single domino (up from 2) –Requirements: Maximum cost of 10 zwigs per dom of interior space Maximum time to build of 2.65 times the number of dominoes (n)
4
Final Design Requirements Structural Engineer: –See appendix on substructures/multiple anchors –Stronger anchors available: Anchor typeMax. loadCost Light duty15 dins30 zwigs Medium duty25 dins95 zwigs Heavy duty50 dins250 zwigs
5
Final Design Requirements Thermal Engineer: –Tighter average temperature requirement: 50 o D < T average < 60 o D
Similar presentations
© 2025 SlidePlayer.com. Inc.
All rights reserved.