Presentation is loading. Please wait.

Presentation is loading. Please wait.

PingER management. Tasks Achieved Remote Node Names –The remote node names have been included in the table –The table structure was modified by adding.

Similar presentations


Presentation on theme: "PingER management. Tasks Achieved Remote Node Names –The remote node names have been included in the table –The table structure was modified by adding."— Presentation transcript:

1 PingER management

2 Tasks Achieved Remote Node Names –The remote node names have been included in the table –The table structure was modified by adding one field and I found the node names by parsing the PingER data. –Asked for feedback from Les and he was satisfied with the values. Have been working on the CSV format –have successfully saved the table data from the database into a CSV file. The file will be stored at the server side. –Having difficulty with getting column names along with the data.

3

4 Current Tasks Default font size. –Checked it but the table exceeds window limits. Also waiting for some response for the firefox browser sorting problem (Aziz suggested removing spaces from the page, but that did not work).


Download ppt "PingER management. Tasks Achieved Remote Node Names –The remote node names have been included in the table –The table structure was modified by adding."

Similar presentations


Ads by Google