Download presentation
Presentation is loading. Please wait.
1
MICE CM15 June 2006Jean-Sébastien GraulichSlide 1 DDAQ Pending Issues o Detector FEE o Software framework o Trigger o Data Storage Jean-Sebastien Graulich, Geneva
2
MICE CM15 June 2006Jean-Sébastien GraulichSlide 2 Detector FEE Tracker AFE IIt under commissioning Firmware development to reduce the dead time is underway. Looks promising TOF Baseline well defined (CFD) Time over Threshold Discriminator Option is cheaper. Should be adopted only if it’s also better. Test will start next week. EmCal Still no validated baseline for charge measurement Tests are under way (Flash ADC). Readout OK, up to 25 MB/s Operation complying with MICE requirements but Generates a lot of data: ~ 30 kB/spill CKOVI Just 8 channels… will use the same FEE as EmCal
3
MICE CM15 June 2006Jean-Sébastien GraulichSlide 3 Software framework Agreement with ALICE Collaboration concerning the use of DATE Me and Vasili (doctoral student) will be trained to DATE in the ALICE DAQ group, working on a real project from Sept 06 to Feb 07. Our advantage Premium training Full support
4
MICE CM15 June 2006Jean-Sébastien GraulichSlide 4 Trigger Preparing funding request for trigger electronics to Geneva university: 40 kEUR for: Trigger receiver modules Trigger logic modules Cables, connectors etc… We have to decide whether we need Programmable Logic or not
5
MICE CM15 June 2006Jean-Sébastien GraulichSlide 5 Data Storage Action is required ! Prepare requests to TIER 1 sites (CERN, Fermilab and KEK?) based on Malcolm’s presentation at DAQ Workshop 2 Don’t expect a small bill… 1 TB/day ~ 500 EUR/day
Similar presentations
© 2025 SlidePlayer.com. Inc.
All rights reserved.