Dust Accelerator: Status and Plans 3 MeV dust accelerator Particle sizes: 0.2 – 2.5 m Particle velocities: < 100 km/s Large test chamber UV sources Solar wind simulator Various targets Small (UHV) test chamber Microphysics diagnostics Additional 20 kV ‘mini’ accelerator Prototype dust head, detectors, etc.
2
Pelletron in NPL Designed after Heidelberg facility HV chamber Dust head Beam lines Particle selection units Located in NPL on East Campus (Physics) Previous use : CU cyclotron 90’ x 56’ high bay (shared) 50 ton crane Lots of power and shielding 12 offices + lab/sample-prep areas
3
Pelletron in NPL high bay
5
NPL Second Floor
6
Near-Term Items NPL Renovation / Re-inhabitation Clear / Paint offices Clear high-bay space Bring power/water/air to Pelletron area FacMan supplied $50k of ICR funds for project Pelletron order 12-month lead time until delivery Chamber / vacuum sys. / cooling / beamlines / detectors / PSU / etc. can be completed during interim Complete fabrication of 20 kV mini-accelerator
Similar presentations
© 2025 SlidePlayer.com. Inc.
All rights reserved.