High Altitude Balloon GPS Repeater Tracking Controller System January 21, 2011
2
Team Members Team : – Team Leader: Elliott Moser – Adam Carpenter – Daniel Marietta Faculty Advisor: – Dr. JohnWu Engineering Mentors: – Bruce Rahn – Steve Overmyer – Nicholas Baine
3
Outline Previous Balloon Experiments Goals for Project Purpose Concerns and Solutions Deliverables/Schedule Questions
4
Previous Balloon Projects 2005-2006 – Beginning of HAB 2006-2007 – Completed development of GPS tracking system – Implemented use of video system 2007-2008 – Attempted deploying truss system using shape memory polymer (SMP) composite material for the hinges
5
Previous Balloon Projects cont. 2008-2009 – Improved power system – Improved video system 2009-2010 – Completed Russ Antenna
6
Goals for the Project Goal 1: – GPS Repeater System Goal 2: – Tracking Controller System
7
Purpose GPS Repeater System – Imposing physical structure – Will allow for indoor testing of HIBAL systems Source: Engadget. http://www.engadget.com/2007/02/21/underground-indoor-gps-repeater-maintains-your-position/
8
Purpose cont Tracking Controller System – Gathers GPS data from payload and chase vehicle – Calculates azimuth and elevation angles between two – Autonomously aims tracking devices at payload – Calculates projected flight path – Calculate estimated Landing Zones
9
Concerns and Solutions GPS Repeater System – Complying with FCC regulations – Complying with Building Codes Tracking Controller System – Complying with FCC/FAA regulations?? – Complying with Building Codes – Environmental issues
10
Deliverables GPS Repeater Tracking Controller System Project portfolio Any other required documentation
11
Schedule Weeks 1-2: Intro to class, form team, choose project. Weeks 2-4: Research on GPS repeaters and Tracking Controller Systems Weeks 4-6: Begin compiling design specs, gather parts list. Week 7: Design Review Oral presentation Weeks 8-10: Complete design and begin implementation. Final week- Design Project Midpoint Progress Conference HAM test- Jan. 26 @ 7 PM P&R Communications Feb. 5 @ 9 AM 148/150 Russ
12
Budget Budget projections cannot be made at this time Each group is given $500 funding Increased Budget due to sponsors
13
Funding Sponsors – The Ohio Space Grant Consortium – Wright State University Curriculum Development Grant – National Science Foundation (CCLI Award number 0837677)
14
Contact Elliott Moser – Moser.18@wright.edu Moser.18@wright.edu Adam Carpenter – Carpenter.62@wright.edu Carpenter.62@wright.edu Daniel Marietta – Marietta.2@wright.edu Marietta.2@wright.edu Web Page – www.cs.wright.edu/balloon www.cs.wright.edu/balloon
15
Questions