17th April, 2005Lifecon Project: Lifetime Workshop, Lyon 1 Lifecon Life Cycle management LMS SYSTEM RELIBILITY BASED METHODOLOGY  System structure  Generic.

Similar presentations


Presentation on theme: "17th April, 2005Lifecon Project: Lifetime Workshop, Lyon 1 Lifecon Life Cycle management LMS SYSTEM RELIBILITY BASED METHODOLOGY  System structure  Generic."— Presentation transcript:

1 17th April, 2005Lifecon Project: Lifetime Workshop, Lyon 1 Lifecon Life Cycle management LMS SYSTEM RELIBILITY BASED METHODOLOGY  System structure  Generic Reliability  Generic Methodology GENERIC TECHNICAL HANDBOOK: "LIFECON LMS"  Framework  Process CONDITION ASSESSMENT PROTOCOL: "LIFECON CAP" PLANNING OF MR&R PROJECTS  LCC and LCE  Selections between methods and materials  Decision making support METHODS FOR OPTIMISATION AND DECISION MAKING  Markovian Chain Method  Quality Function Deployment QFD Method  Risk Analysis  Multiple Attribute Decision Making Aid DEGRADATION MODELS  Duracrete  RILEM TC 130CSL EURO- PEAN VALIDA -TION - Case Studie s IT- PROT O- TYPE

2 17th April, 2005Lifecon Project: Lifetime Workshop, Lyon 2

3 17th April, 2005Lifecon Project: Lifetime Workshop, Lyon 3 Lifecon Life Cycle management LMS SYSTEM RELIABILITY BASED METHODOLOGY  System structure  Generic Reliability  Generic Methodology GENERIC TECHNICAL HANDBOOK: "LIFECON LMS"  Framework  Process CONDITION ASSESSMENT PROTOCOL: "LIFECON CAP" PLANNING OF MR&R PROJECTS  LCC and LCE  Selections between methods and materials  Decision making support METHODS FOR OPTIMISATION AND DECISION MAKING  Markovian Chain Method  Quality Function Deployment Method QFD  Risk Analysis  Multiple Attribute Decision Making Aid DEGRADATION MODELS  Duracrete  RILEM TC 130CSL EUROPEAN VALIDATION  Case Studies IT- PROTO- TYPE

4 17th April, 2005Lifecon Project: Lifetime Workshop, Lyon 4 Basic Characteristics of LIFECON LMS 1. Generic can be applied for any kind of concrete infrastructures new program modules can be easily added different degradation models can be used 2. Integrated integrated two level system harmonising the object level work programme with the network level optimum different matters can be taken into account in the decision making prosess 3. Probabilistic mathematical solutions are based on probabilistic methods with probabilistic degradation and repair models

5 17th April, 2005Lifecon Project: Lifetime Workshop, Lyon 5 General Characteristics of LIFECON Framework LIFECON LMS consists of three separate systems: 1. Object Level System yearly MR&R projects based on inspection and condition assessment 2. Network Level System long and short term operative planning and decision making 3. Network and Object Level System integrated two level system harmonising the object level work programme with the network level optimum

6 17th April, 2005Lifecon Project: Lifetime Workshop, Lyon 6 LIFECON Decision Making

7 17th April, 2005Lifecon Project: Lifetime Workshop, Lyon 7 LIFECON Levels of Decision The structures are divided into three levels of structural hierachy: 1. Component/module level structural components e.g. beams, columns, combined modules 2. Object level complete structures or buildings 3. Network level networks of objects e.g. stocks of bridges or buildings

8 17th April, 2005Lifecon Project: Lifetime Workshop, Lyon 8 LIFECON Operational Flow Diagram

9 17th April, 2005Lifecon Project: Lifetime Workshop, Lyon 9 Main Processes of LIFECON LMS 1/3 1. Administrational Inputs Definition of strategic targets 2. Analyses Life cycle and risk analyses Markov chain long term analysis Structural and functional analyses Budget share analyses Revision of decision trees of LCAPs Preliminary rehabilitation planning

10 17th April, 2005Lifecon Project: Lifetime Workshop, Lyon 10 Main Processes of LIFECON LMS 2/3 3. Planning of MR&R Actions Markov chain short term analysis Definition of budget limits and optimal MR&R action distributions Definition of MR&R actions Timing of actions and evaluation of action costs Entering the rehabilitation plans into database 4. Planning of Projects Harmonising the action distributions with the network level optimum Recalculation of action distributions from proposed work programmes Combining MR&R actions into object based groups Sorting of the proposed objects into budget categories Priorisation of proposed objects in budget categoriePlanning of projects Detailed planning of projects and preparation of contract documents

11 17th April, 2005Lifecon Project: Lifetime Workshop, Lyon 11 Main Processes of LIFECON LMS 3/3 5. Preparation of Annual Work Plans Budget share into budget categories Priorisation of projects and budget check Preparation of annual project and resources plans 6. Data Collection and Modelling Inspection and condition assessment Updating of degradation and cost models Project execution

12 17th April, 2005Lifecon Project: Lifetime Workshop, Lyon 12 Mathematical Methods of LIFECON LMS Markov Chain Method Probabilistic approach to degradation and repair action modelling Multi-Attribute Decision Aid MADA Consideration of many objectives at the same time Quality Function Deploiment QFD Examination of correlation and relative importance of different objectives Different Risk Analyses Methods


Download ppt "17th April, 2005Lifecon Project: Lifetime Workshop, Lyon 1 Lifecon Life Cycle management LMS SYSTEM RELIBILITY BASED METHODOLOGY  System structure  Generic."