MOM - M.ApollonioMICO meeting - RAL - 17/3/20081 NEXT steps + proposed aims Today - START Cherenkov INSTALLATION (?) Tuesday 25 MARCH - MICO Meeting (?

Similar presentations


Presentation on theme: "MOM - M.ApollonioMICO meeting - RAL - 17/3/20081 NEXT steps + proposed aims Today - START Cherenkov INSTALLATION (?) Tuesday 25 MARCH - MICO Meeting (?"— Presentation transcript:

1 MOM - M.ApollonioMICO meeting - RAL - 17/3/20081 NEXT steps + proposed aims Today - START Cherenkov INSTALLATION (?) Tuesday 25 MARCH - MICO Meeting (? change of date proposal) - MAGNET DRY RUN Wednesday 26 MARCH – Machine Scheduling Meeting Thursday 27 MARCH - START of ISIS MD RUN - ISIS Schedule Meeting a) request one or two shift(s) to do particle rate measurement in parasitic mode - MICE Video Conference arrival of TOF0/1/2 & KL @ RAL (< April 2 nd ) Wednesday 2 APRIL - START ISTALLATION of TOF0/1/2 & KL in DSA Monday 7 APRIL - END of TOF+KL INSTALLATION Tuesday 8 April - Start of ISIS PHYSICS RUN SHUTDOWN RUN UP & MD PHYSICS RUN

2 MOM - M.ApollonioMICO meeting - RAL - 17/3/20082 DRY RUN

3 MOM - M.ApollonioMICO meeting - RAL - 17/3/20083 Major Works prior to run (<27 march) 1) D1 & D2 : - fix power supply failure (experts coming today from DL) - (minor?) water leak problem on D1 - dry run (25 march) checklist: water OK? power OK? 2) Q1-3, Q4-6, Q7-8 - fix power failure - dry run (25 march) checklist: water OK? power OK? 3) Vacuum Chamber in upstream BL - dry run checklist: bellows between pipes installed ? vacuum tested? - prepare for run 4) Decay Solenoid - dry run checklist: cryogenics OK? power OK? 5) Target - check everything’s working before 27 march (stepper motors, BLM signals) BeamLine Target spare parts


Download ppt "MOM - M.ApollonioMICO meeting - RAL - 17/3/20081 NEXT steps + proposed aims Today - START Cherenkov INSTALLATION (?) Tuesday 25 MARCH - MICO Meeting (?"