Download presentation
Presentation is loading. Please wait.
1
NEW GCOOS Proposals RA Support Data Portal/Regional Operation Center Meteorological Instrumentation HF Radar Future: Gap Analysis, Satellite products, HABs, Hypoxia, Other
2
RA Support Submitted 15 August 2007 ~$400,000/year for 3-years Regional Coordinator 50% time Data Management Coordinator 25% time Research Associate 100% time Co-PI Nowlin 5% time
3
RA Support Meetings component –Board meetings –Parties meetings –Council and Committee meetings –One observing system design workshop –One stakeholders workshop –Coordinators’ travel support
4
RA Support E/O component –E/O Coordinator 6.5 months/year
6
Data Portal/Regional Operation Center 3 years to follow-on Year 1 of Data Portal development $500,000-$600,000 per year Jochens as Lead PI Howard as Co-PI for DP and ROC Walker as Co-PI for E/O Component Support for E/O Coordinator Support for development and maintenance of GCOOS wiki for observing systems inputs
7
Data Portal/Regional Operation Center Components: –Data Portal Year 1: Internal testing & review/roll-out Year 2: Roll-out and evaluation Year 3: Maintain and enhance –Regional Operation Center Year 1: Initiate planning Year 2: Planning and develop proto-type Year 3: Develop & test proto-type –Education and Outreach Year 1: TBD Year 2: TBD Year 3: TBD
8
HF Radar ~2 year project to –Develop interoperability of WERA, CODAR, and in situ systems –Develop Gulf-wide surface current observing system plan Stephan Howden, USM, as Lead PI Other participants: UM, USF, FSU, LSU, TAMU Sharon Walker as E/O PI Ann Jochens as GCOOS-RA representative
9
HF Radar Components –CODAR/WERA integration/interoperability: Florida Straits West Florida shelf Mississippi shelf –Develop Gulf-wide HF radar observing system –Education and outreach activities: TBD
10
Meteorological Instrumentation 2 (3??) year project ~$250K/year Cort Cooper as Lead PI Others as Co-PI? Ann Jochens as GCOOS Rep Co-PI? E/O co-PI??? Who submits proposal? TAMRF?
11
Meteorological Instrumentation Components –Year 1: Sensor Integration and Testing –Year 2: Installation of 10 packages –Year 3: Build-out to XX packages and maintain???? Education and outreach component??
12
Future: Gap Analysis Proposed by Russ Beard
13
Future: Other HABs Observing System
14
Future: Other Hypoxia Observing System –NOAA Monitoring Implementation Plan Satellite products –Plan development task? –GOMRC project linkages?
Similar presentations
© 2025 SlidePlayer.com. Inc.
All rights reserved.