Presentation is loading. Please wait.

Presentation is loading. Please wait.

Friday 24 July 2009 CloudSat. Things Accomplished pressed onward with the integration ordered PCB’s water table design.

Similar presentations


Presentation on theme: "Friday 24 July 2009 CloudSat. Things Accomplished pressed onward with the integration ordered PCB’s water table design."— Presentation transcript:

1 Friday 24 July 2009 CloudSat

2 Things Accomplished pressed onward with the integration ordered PCB’s water table design

3 Tasks for All Begin documentation in force Dani permanent assembly of OctoPump Check GUI compatibility with Mac Molly finish sphere attachment finish actuator holders Dani and Molly finalize water table design build it Clay and Steve integration of the system

4 WEDNESDAY Sphere attachment system Actuator holders water table prototype THURSDAY finish sphere guts water table design FRIDAY PCBs ordered finalize design, get materials BY MONDAY full integration of the mass balance system at least half of mechanical integration


Download ppt "Friday 24 July 2009 CloudSat. Things Accomplished pressed onward with the integration ordered PCB’s water table design."

Similar presentations


Ads by Google