CONSTRUCTION PLANNING
3
PLANNING WHAT CONTROL PLANNING PROCESS COSTRUCTION PLANNING CONSTN ACTIVITIES BAR CHART ARROW NETWORKG LOB CASHFLOW
4
ECONOMIC SECTOR AGRI, MANUFACTRING SERVICES, TOURISM, CONSTRUCTION
5
SECTOR SOCIALS, POLITICS, ECONOMY, PUBLIC AND PRIVATE SECTOR, FINANCE CONSTRUCTION PROJECT
6
CONSTRUCTION PROJECTS TYPE OF PROJECTS, PUBLIC AND PRIVATE, FINANCE, PROJECT MANAGEMENT, TYPE OF PROCUREMENTS CONSTRUCTION MANAGEMENT
7
CONSTRUCTION MANAGEMENT CONSTRUCTION INPUT/OUTPUT, CONSTRUCTION RESOURCES, BURUH, MESIN, BAHAN2 CONSTRUCTION PLANNING
8
CONSTRUCTION PLANNING PROJECT PLANNING, SITE PLANNING SCHEDULING, PROGRAMMING; BAR CHART ARROW NETWORKING LINE OF BALANCE (LOB) PRECEDENCE DIAGRAM CONTRACTORS CASHFLOW
9
PERANCANGAN “PERANCANGAN IALAH PROSES PEMBUATAN KEPUTUSAN TERDAHULU TERHADAP APA YANG PERLU DIBUAT DAN BAGAIMANA” K&R 478 IA MELIBATKAN MISSI KESELUROHAN, KENALPASTI PENYELESAIAN UTAMA, TENTUKAN OBJEKTIF, KEMBANGKAN POLISI, PROGRAM, PROSEDUR UNTUK MEMCAPAINYA. CIRI-CIRI: MASA DEPAN TINDAKAN PLAN TINDAKAN/PENCAPAIAN
10
FASA RAMALAN FASA PERANCANGAN FASA PELAKSANAAN DATA/ MAKLUMAT ASAS PERANCANGAN JGKA PANJANG JGKA SEDERHANA JGKA PENDEK KAWALAN/ MANTAUAN SEMAKAN PROSES PERANCANGAN
11
PERANCANGAN BINAAN IALAH PROSES PEMBUATAN KEPUTUSAN TERDAHULU TERHADAP AKTIVITI-AKTIVITI PROJEK BINAAN DAN CARA BAGAIMANA AKTIVITI2 TERSEBUT PERLU DIJALANKAN BAGI PENCAPAIAN OBJEKTIF PROJECK.
12
PERANCANGANKAWALAN/PEMANTAUAN PEMBETULAN SELEWENG PERANCANGAN DAN PEMBETULAN
13
BAR/GANTT CHART
14
NETWORK DIAGRAM
16
TAWARAN PROJEK BINAAN – SATU PROSES
17
CLIENT INTENTION LAND MATTERS ACQUISITION CONVERTION AMALGAMATION MARKET STUDY FEASIBILITY STUDY DESIGN CONCEPT PENGURUS PROJEK JURUNILAI JRUUKUR TANAH JURUUKUR BAHAN ARKITEK PLANNER RESEARCHER
18
PENGURUS PROJEK JURUUKUR BAHAN ARKITEK PLANNER DRAWINGS BILL OF QUATITIES SPECIFICATION RATES CALL FOR TENDER SUBMISSION OF TENDER EVALUATION OF TENDER AWARD OF CONTRACT
19
LAYOUT PLAN ARCHITECTURAL DESIGN C & S DESIGN DETAILINGS M & E DESIGN LANDSCAPE DESIGN AUTHORITIES APPROVAL – o PLANNING – o SUB-DIVISIONS – o BUILDING DESIGNS – o STRUCTURAL DESIGN M & E DESIGN PENGURUS PROJEK JURUNILAI JRUUKUR TANAH JURUUKUR BAHAN ARKITEK PLANNER RESEARCHER
20
TAKE OVER SITE MOBILIZATION OF RESOURCES – o MANPOWER – o CONSTRUCTION MATERIAL AND COMPONENTS – o CONSTRUCTION PLANT AND EQUIPMENT ACTUAL CONSTRUCTION PRACTICAL COMPLETION OBTAINED O.C. PENGURUS PROJEK JURUUKUR BAHAN ARKITEK C & S M & E CONTRAKTOR
21
– HANDING OVER – DEFECT LIABILITY PERIOD (DLP) – FINAL ACCOUNT PENGURUS PROJEK JURUUKUR BAHAN ARKITEK C & S M & E CONTRAKTOR
22
COST TIME QUALITY SATISFACTION
23
PROSES PELBAGAI INPUT
25
BINAANLEPAS BINAAN PRA BINAAN
26
PERANCANGAN SEMASA TENDER PERANCANGAN PEMBINAAN PERSEDIAAN PEMBINAAN “FASA YANG MERANGKUMI BERMULANYA PENENTUAN HARGA DALAM SESUATU PROJEK OLEH KONTRAKTOR SEHINGGALAH TARIKH PENGAMBILALIHAN TAPAK OLEH KONTRAKTOR.”
27
SKOP KERJA: PERANCANGAN TAPAK PERANCANGAN BAHAN BINAAN PERANCANGAN TENAGA KERJA PERANCANGAN LOJI DAN PERALATAN PROGRAM KERJA PERANCANGAN KOS PERATURAN DAN UNDANG-UNDANG
32
MANAGING CONSTRUCTION RESOURCES MANPOWER MATERIALS AND COMPONENTS PLANT AND EQUIPMENT TIME MONEY
34
Materials What When Where CONSTRUCTION PRODUCTION INFORMATION THE PROSES
36
CONVERSION PROCESS OUTPUT INPUT
38
TYPE OF PLANT COMPRESSOR DELIVERY TRUCK TOWER CRANE EXCAVATOR LORRIES MONTH 1 2 3 4 5 6 7 8 REMARKS PROVIDE WTH N METRES OF HOSE AND 2 GUN MAINTAIN IN 6 MONTH MOBILE CRANE TO OFFLOAD + FITTER TO ASSEMBLE HIRED IN FROM ABC CO. HIRED FROM ABC CO. A TYPICAL PLANT SCHEDULE
40
Analysis Of M/power Requirement Investigation Of Sources Utilisation On Site Operating Within The Law MANPOWER SCHEDULE
41
TYPE OF M/POWER TECHNICAL STAFF GENERAL WORKERS BRICKLAYER CONCRETOR SCAFFOLDERS MONTH 1 2 3 4 5 6 7 8 REMARKS OWNED OWNED WORKERS SUB-CONTRACTOR HIRED IN FROM XYZ CO. HIRED FROM ABC CO. A TYPICAL MANPOWER SCHEDULE
43
PROGRAMMING AND SCHEDULING TECHNIQUES: BAR CHART ARROW NETWORKING CRITICAL PATH METHOD PRECEDENCE DIAGRAM RESOURCE AGGREGATION & LEVELLING LINE OF BALANCE
44
PROGRAMMING AND SCHEDULING TECHNIQUES: COMPUTER SOFTWARES: MICROSOFT PROJECT PRIMAVERA