Download presentation
Presentation is loading. Please wait.
1
Today’s (12.7) Report LIU Qian
2
East EC is ready, we are going to install the EC TOF next Monday.
3
Move the main bundles The breakout is protected The common end is protected By TOF Tricycle
4
The upper distribution box The main bundle New position, Direction: west to east (safer, and easier to connect with fibers) Old position, Direction: North to south The extra length of fibers are over-under coiled.
5
Close look of fiber management
6
The fibers’ heads They are all hidden in the shelter.
7
The rack Moon box UH Module Height: 1.20 m The ruler starts from 1.50 m Height: 1.60 m
8
Common end The common end of east. We didn’t remove the protective tube yet.
9
Conclusion We only finished the 12 bundles installation. (since the people who helped me install the fibers are employed temporarily, for now only one IHEP employee and I are installing the bundles. But that’s OK, since we don’t want to push it in a hurry.) The bottom box has been installed. We’ll try to finish the rest bundles in this weekend. Next Monday we’ll begin to install the EC TOF of east side.
Similar presentations
© 2025 SlidePlayer.com. Inc.
All rights reserved.