Tracker Week April ‘03G.Sguazzoni1 FE hybrid assembly and quality assurance The hybrid team: Alan Honma, Michael Poettgens, Gabriella Pasztor, Bernd Reinhold, G.S. Bruno Wittmer CERN –EP Division “...resistance of hybrids is not futile…”
2
Tracker Week April ‘03G.Sguazzoni2 Assembly procedure @ CERN Hybrid assembly test Test during thermal cycle(s) Pitch Adapter (PA) gluing at the gantry (PA bonding) Bare Hybrid (no Pitch Adapter) Reception test 12 3
3
Tracker Week April ‘03G.Sguazzoni3 Hybrid reception ‘fast’ test Check that no damage occurred during shipping Fast ARC test FHIT like will be replaced by FHIT
4
Tracker Week April ‘03G.Sguazzoni4 Gantry PA assembly First 50 TOB hybrids glued @ the gantry… all good!!! Hyb+PA TOB: 16/plate Gantry time 1h Curing 8h Spacer+PA TOB: 64/plate Gantry 30min Curing 8h Typical requested throughput 52 hyb/day Handling and preparation is a limiting factor First 50 TOB hybrids glued @ the gantry… all good!!! Hyb+PA TOB: 16/plate Gantry time 1h Curing 8h Spacer+PA TOB: 64/plate Gantry 30min Curing 8h Typical requested throughput 52 hyb/day Handling and preparation is a limiting factor
5
Tracker Week April ‘03G.Sguazzoni5 Hybrid assembly results RMSs (in m ) indicate assembly precision within bonding requirements All hybrids have been bonded successfully!!! stability as the glue cures checked and fine!!! RMSs (in m ) indicate assembly precision within bonding requirements All hybrids have been bonded successfully!!! stability as the glue cures checked and fine!!! ~14~11 ~42 ~43 50 ( x 1, y 1 ) ( x 2, y 2 ) x1x1 y1y1 y2y2 x2x2
6
Tracker Week April ‘03G.Sguazzoni6 Post PA assembly tests ...to insure that: the hybrid is still alive after many operations the PA bonds are OK no opens, no shorts! the hybrid+PA survives… …a cooling cycle (T ROOM –20 o C T ROOM ) …multiple (~10) thermal cycles (to emulate CMS shutdowns) We need a nice test setup!!! Sample test!!!
7
Tracker Week April ‘03G.Sguazzoni7 The nice test setup Located in the new CERN Gantry Clean ROOM TestBox Electronics Water/Gas management Water/Gas management Chair Status screens Water leak detector
8
Tracker Week April ‘03G.Sguazzoni8 Test setup block diagram
9
Tracker Week April ‘03G.Sguazzoni9 Test Box 4 hybrid slots standard/stereo N 2 /dry air flushed temperature sensors humidity sensors Cooling/Heating: 300W Peltier element (24V-14A) T LOWEST ~ -25 o C with max load (4 running hybrids) hybrid on the test plate
10
Tracker Week April ‘03G.Sguazzoni10 Readout & GUI ARC based readout automatic cycling/testing of all loaded hybrids TCP/UDP communication with slow control application Ready soon: DB compliant output “One-button” test
11
Tracker Week April ‘03G.Sguazzoni11 Slow control: hardware Aachen Cooli box controller RS232 interface Peltier driving Temperature/Humidity sensor readout safety interlocks ...custom patched for: gas/water flow meter NIM-TTL pulser driving
12
Tracker Week April ‘03G.Sguazzoni12 Slow control: software Temperature monitor Humidity monitor Peltier current Safety TCP UDP Temperature regulation Water & gas flow Custom version of Aachen Cooli Devive Controller – ACDC (LabVIEW)
13
Tracker Week April ‘03G.Sguazzoni13 Post PA assembly tests Typical test sequence during a cooling cycle Hybrid ON* Ped, Noi Pulser Short Detection Hybrid OFF* *Added after problem with hybrid in cold (see later) T ROOM –20 o C ~25 min/4 hybrids
14
Tracker Week April ‘03G.Sguazzoni14 Long term cycles Sample test!!! emulates ~10 CMS running-shutdown periods Each cycle same tests as the single cycle… T ROOM –20 o C ~5 hours/4 hybrids last cycle: stronger! (T ROOM –25 o C +35 o C)
15
Tracker Week April ‘03G.Sguazzoni15 Noise issues for hybrid+PA No reference plane below PA PA is a weak point wrt noise injection ampli channel GND lines connected to the support plate by a wide copper strip Hybrid ARC FE Hybrid GND plane Hybrid Al support plate PA line ARC FE adaper
16
Tracker Week April ‘03G.Sguazzoni16 Noise comparison Grounding scheme comparison PA lines length structure BAD grounding NEW grounding
17
Tracker Week April ‘03G.Sguazzoni17 Short detection 1 SHORT = 2 channels lost
18
Tracker Week April ‘03G.Sguazzoni18 Short detection principle Calibration signal is sent every 4 channels PIN HOLE like effect may also contribute IN OUT ch. #N ch. #N+1 CAL signal
19
Tracker Week April ‘03G.Sguazzoni19 Short detection Simple and effective threshold criterium SHORTs Pulse shape Pulse heights
20
Tracker Week April ‘03G.Sguazzoni20 The first (detected) short! Short = bonding problem PA APV
21
Tracker Week April ‘03G.Sguazzoni21 Open detection OPEN = 1 channel lost
22
Tracker Week April ‘03G.Sguazzoni22 Pulser hardware ARC NIM pulser trigger NIM to TTL start out 50 “antenna” very close (~1mm) to the bond pads Peak - InvOFF Pulser ON Peak Mode Optimal latency OPENS
23
Tracker Week April ‘03G.Sguazzoni23 Open detection: basics Removed Hybrid-PA bonds or scratch on PA lines* Spikes in the pedestal profile!!! Removed Hybrid-PA bonds or scratch on PA lines* Spikes in the pedestal profile!!! On-board CM subtraction Pedestal ~unchanged On-board CM subtraction Pedestal ~unchanged *even quite close to the bonding pads
24
Tracker Week April ‘03G.Sguazzoni24 The open-detection criteria Optimal to detect isolated opens Difference wrt neighbours Mean Subtracted Pedestal OPENS in our test hybrid
25
Tracker Week April ‘03G.Sguazzoni25 The TOB outcome so far… 78 received Reception TEST 72/74 good; 2 not OK 11 FNAL & 5 UCSB 2 ‘ TEC1.1 ’ Aachen Assembled 48/48 good Bonded 45/45 good Thermal cycle test Standard: 20/20 good 20 FNAL; Long term: 8/9 good, 1 fails in cold 14846/14848 good bonds; 1 short, no opens
26
Tracker Week April ‘03G.Sguazzoni26 Pedestal Large non-uniformities Max-Min APV wise Pedestal cuts in module-test draft procedure ~ too tight Pedestal Pedestal APV wise Preliminary!!!
27
Tracker Week April ‘03G.Sguazzoni27 Hybrid+PA Noise Normalized Noise cuts ( 20%) in module test draft procedure -20 o C ROOM Noise increases in cold Peltier current? Preliminary!!! Noise Noise
28
Tracker Week April ‘03G.Sguazzoni28 The faulty hybrid: i.e. the kind of nasty problems we are supposed to discover The hybrid fails only @–20 0 C No APVs output but answers to I 2 C commands other strange behaviors (current, DCU readings) only a certain command sequence induces the failure; otherwise the hybrid works perfectly Test procedure modified to foresee hybrid OFF/ON & initialization before any group of tests First crude investigation: No visible defect MUX chip??? …further study needed
29
Tracker Week April ‘03G.Sguazzoni29 Test Station throughput Target: Nominal: 32 hybrids/day UCSB will take over TOB bonding and testing – they are duplicating the setup 4 hybrids 40 min (preparation+test) Limiting factors Cooling time Loading/Unloading (40min/4hyb) * 32hyb ~ 5h Effective production request could be higher… A second “CERN” teststation is in preparation (Cooling cycle test could be done on sample basis or dropped in case no problems are found)
30
Tracker Week April ‘03G.Sguazzoni30 Conclusion Hey folks, is there someone willing to test hybrids on a large scale?!?!…