Download presentation
Presentation is loading. Please wait.
1
CARMA Dick Plambeck UC Berkeley (for the CARMA consortium) www.mmarray.org URSI, 24 June 2003, Columbus, Ohio
2
+ UChicago SZA 8 3.5-m antennas Berkeley-Illinois-Maryland Assn. array 10 6.1-m diameter antennas Caltech array 6 10.4-m antennas
3
people OVRO D. Woody S. Scott J. Lamb D. Hawkins J. Carpenter A. Sargent G. Blake N. Scoville Berkeley D. Plambeck M. Wright A. Bolatto C. Kraybill M. Fleming L. Blitz W.J. Welch Maryland M. Pound P. Teuben K. Rauch S. Vogel L. Mundy A. Harris Illinois R. Plante D. Mehringer L. Snyder R. Crutcher L. Looney + programmers, engineers, technicians, postdocs, graduate students project manager: Tony Beasley
4
antennas 3 different antenna diameters - a heterogeneous array exploit new algorithms for mosaicing, high fidelity imaging sensitive to wide range of spatial frequencies; image large objects CARMACARMA + SZA # antennas1523 # baselines105253 collecting area773 m 2 850 m 2
5
M33
6
BIMA mosaic of M33 CO 1-0 115 GHz 759 pointing centers
7
BIMA mosaic of M33 ( Engargiola et al. 2003) 148 GMCs detected overlie HI filaments (HI image: Deul & van der Hulst 1987)
8
receivers for the 1mm and 3mm bands: 4 GHz bandwidth, 1 polarization at first light continuum sensitivity: 2-3 mJy/beam, in 1 minute 230 GHz brightness sensitivity: 1 K for 1 km/sec channel, 1'' beam, in 1 hour freq (GHz)OVROBIMASZA 210-270SIS 85-116SISSIS (70-116)MMIC 29-37HEMT 22MMIC
9
site selection and acquisition requirements: within 60 minute drive of existing OVRO infrastructure elevation 7000-9000 ft for good atmospheric transmission but low snow load 400-m diameter flat area, + baselines to 2 km avoid environmental battles all such sites are in Inyo National Forest, require Environmental Impact Report
10
Cedar Flat Juniper Flat OVRO environmental studies done for 2 sites
11
Juniper Flat – 7900’
12
Cedar Flat – 7300’
13
Cedar Flat: 20 min drive to OVRO on paved road, maintained (and plowed) by Caltrans Highway 168 simulated antenna
14
Percentiles 25% < 0.12 50% < 0.16 75% < 0.28 225 GHz
15
BIMA antenna move keep dish and feed legs in one piece move 9 antennas in 8 weeks
16
OVRO antennas will be dismantled to pass through “the narrows”
17
array configurations 5 antenna configurations, approx 55 pads 2 km max baseline
18
Cedar Flat E-array (most compact) synth beam 4.5" at 230 GHz array center
19
E-array BIMA antennas within collision range SZA provides even shorter spacings combine with single dish measurements from 10.4-m antennas to recover all spatial frequencies
20
A-array 0.13" synth beam
21
u,v coverage for declination –30 4-hr observing track
22
A-array synthesized beam, declination –30 0.26 × 0.14" FWHM 5% contours
23
BIMA A-array detection of a stellar flare in Orion ( 86 GHz, synthesized beam 0.9 × 0.5" ) 20 Jan 2003 4 UT 20 Jan 2003 8 UT BN IRc2 30 mJy150 mJy
24
use common transporter for 6-m and 10-m antennas avoid ‘custom’ vehicle 50% of weight on tow vehicle for traction antenna transporter
25
transporter tow vehicle: 6-wheel drive military truck (Oshkosh MTVR)
28
fiberoptics all communication with antennas via 8 singlemode optical fibers use standard SMF 28 fiber - length change with temperature is 1 part in 10 5 use BIMA round trip phase measuring system to monitor fiber lengths
29
diurnal changes in fiber length (BIMA data from July 2002) 135’ of fiber at outdoor air temp ( = 200 nsec) ~ 2 psec/C ~ 180°/C at 230 GHz Sun hits fibers fiber lengths outdoor air temp
30
BIMA round trip phase measurement synth laser TRX cpl RXMXR cplRX phslck ref fiber 1 fiber 2 advantage: no electronics at the antenna, just a fiber coupler disadvantage: lengths of fibers 1 and 2 must track with temperature and flexure (requires loose tube fiber)
31
raw phases on 3c454.3 through sunrise
32
phases on 3c454.3 through sunrise after correction
33
Caltech COBRA correlator based on FPGAs, not custom correlator chips 4 GHz bandwidth 256 channels, 20 MHz resolution 15 baselines
35
CARMA first light correlator uses COBRA hardware design 15 telescopes, 105 baselines 8 independent sections: –may be positioned anywhere in 4 GHz IF band –choose 2, 8, 31, 62, 125, 250, or 500 MHz bandwidth –velocity resolution 0.04 to 40 km s -1 / channel at 1.3 mm separate SZA correlator: 8 antennas, 28 baselines, 8 GHz bandwidth
36
COBRA: each board handles 5 baselines, 500 MHz/baseline, 32 chans/baseline CARMA: reprogram FPGAs to handle 10 baselines, add spectral line capability
37
timeline Jan 2003draft environmental document submitted Mar 2003Forest Service decision: Cedar Flat Jun 2003end of public comment period Aug 2003Forest Service record of decision Oct 2003appeals period ends early 2004SZA operational at high site mid 2004move OVRO and BIMA antennas to high site 2005begin operation
38
BIMA summer school
39
Alberto Bolatto testing prototype WVR in Berkeley
40
John Carlstrom repairing the Air Products refrigerator on receiver 3 Leslie Looney pulling underground fiber for long baselines
41
7th graders at Hat Creek
Similar presentations
© 2025 SlidePlayer.com. Inc.
All rights reserved.