Download presentation
Presentation is loading. Please wait.
1
Modern Improvements COMPACT 200 RAPID REACTION BRIDGE SYSTEM
2
Modern Improvements
3
COMPACT 200 RAPID REACTION BRIDGE SYSTEM The design of the Mabey Compact 200 bridge allows the system to be used in a logistic role throughout the support area. As a Line of Communication bridge it can carry loads of up to Class 110 over gaps of up to 60m (200ft). The bridge is ideally suited for areas where speed of deployment is vital.
4
Modern Improvements Rapid Construction The bridge is designed to be built by hand. A 30m bridge can be assembled and conventionally launched by 29 men in two or three hours, depending on site conditions. Where cranes or materials handling equipment is available, the total number of man hours to assemble a bridge is substantially reduced.
5
Modern Improvements Load Testing Launching Nose
6
Modern Improvements
7
B Co, 23 rd Engr Bn replacing the Brcko Bridge with the Compact 200 (MAR 96)
8
Modern Improvements M2 BaileyMabey Compact 200 MLCMLC 80(T) 70 (W)MLC 80 (T) 110 (W) # of Bays13 ConstructionDTDS # of Panels 156 -- 2 ½ Sets of Bailey 52 # of Transoms6614 Roadway Width12 ft. 6 in (3.8m)13 ft. 9 in. (4.2m) Type of DeckTimberSteel Total Weight87 t55 t Based on the launch and erection of a 130ft (39.62m) clear span, single lane bridge.
9
Modern Improvements M2 Bailey Mabey Compact 200 # of Bridging Sets Required 2 ½ Sets1 # Men Required9029 # of Trucks Required At Least 15 PLS (7 PLS per Set) 11 PLS # of Crane Picks Required 22266 HOURS REQUIRED12-14 hours8-9 hours Based on the launch and erection of a 130ft (39.62m) clear span, single lane bridge to carry MLC80 (T). Note, the M2 Bailey is unable to accommodate MLC 96 (W) Traffic.
Similar presentations
© 2025 SlidePlayer.com. Inc.
All rights reserved.