Download presentation
Presentation is loading. Please wait.
1
New 135-MeV injector energy requires minor changes to linac operating point…
2
(easy)
3
(July 9, 2003) LCLS Accelerator and Compressor Schematic SLAC linac tunnel undulator hall Linac-0 L =6 m Linac-1 L =9 m rf = 25° Linac-2 L =330 m rf = 41° Linac-3 L =550 m rf = 13° BC-1 L =6 m R 56 = 39 mm BC-2 L =22 m R 56 = 25 mm DL-2 L =66 m R 56 = 0 DL-1 L =12 m R 56 0 undulator L =120 m 6 MeV z 0.83 mm 0.01 % 135 MeV z 0.83 mm 0.10 % 250 MeV z 0.19 mm 1.6 % 4.54 GeV z 0.022 mm 0.71 % 14.35 GeV z 0.022 mm 0.02 %...existing linac new rfgun 25-1a30-8c21-1b21-1d X Linac-X L =0.6 m rf = 21-3b24-6d
4
No engineering changes made – all changes are in operational parameters DL1 bend fields are reduced from 7.521 kG to 6.769 kG X-band rf phase tolerance almost 2-times looser Mean Ls rf phase tolerance 2-times looser L1 rf gradient reduced to very reasonable 16.8 MV/m Old parameter set still possible with only ‘control-room’ adjustments
Similar presentations
© 2024 SlidePlayer.com. Inc.
All rights reserved.