DAQ&CM Infrastructure Paul Drumm
2
Issue Space is running out! Power supplies, RF system –Big kit, legislation dictates space requirements (not a clear definition); Start to layout control room –False floor? –Height of racks? –Cable trays at height?
3
Issue Space is running out! Power supplies, RF system –Big kit, legislation dictates space requirements (not a clear definition); Start to layout control room –False floor? –Height of racks? –Cable trays at height?
4
Questions How many racks are needed? Where are they needed? How many cables/etc are needed between the control room and the hall?
5
Rack Count
7
Black Holes in the MLCR Holes back to the MLCR 5 max Need shielding –Better to have some spare but not to overdo it