Download presentation
Presentation is loading. Please wait.
1
Cosmic Ray Analysis 1M.Ellis - CM23 - Harbin - 15th January 2009 Not enough time to go into detail, so just a quick summary of the status since CM22: u Remaining decoding issues have been fixed (Hideyuki). u All waveguides show good light yield with no obvious variations in light yield across the surface of the planes. u One or two station connectors may still need to be checked and verified (see dead channel plots). u Currently preparing plots and text for NIM paper on tracker performance.
2
Station 4 Plane W – Fixed! 2M.Ellis - CM23 - Harbin - 15th January 2009
3
3 Dead Channels 3M.Ellis - CM23 - Harbin - 15th January 2009
4
Next Steps LY per plane (trivial to add). Add fits to most probable peak for LY plots. Generate table of LY values from fits. Do Station alignment in the tracker to centre residuals with points removed. Determine expected RMS values so we can compare with real data. Put it all into the NIM paper... 4M.Ellis - CM23 - Harbin - 15th January 2009
Similar presentations
© 2024 SlidePlayer.com. Inc.
All rights reserved.