1 Status at DORIS Hall Bolted connections of Al- frame made conductive for grounding reasons. Power cable connections rerouted at the top connections. Magentic field measurements on ringinner side performed. Several movement of coils necessary Jan Hauschildt, MEA1, 2011, January 25th, Works from October to January Works before Shutdown

2 Status at DORIS Hall Doris Shutdown started December 6th Shielding dismantled Cavities removed 4 Quadrupoles includig supports removed New support for 6 Quadrupole installed Bridge for target and vacuum system installed Temporary cover for pit made of concrete blocs Jan Hauschildt, MEA1, 2011, January 25th,

3 Status at DORIS Hall, Hall 1 6 Qudrupoles installed and aligned. DESY part of new vacuum system instelled. Supported commisioning of Target and vacuumsysten in December and insatllion in January. System under Vaccum on January 14th. Shielding erected, still continuing, should be finished by January 26th Jan Hauschildt, MEA1, 2011 Januar 25th,