CITRIS Building Startup Space Committees Carlo Séquin, Gary Baldwin, Keat Saw, Scott Shackleton Design of the “Macro-Lab” February 22, 2006.

Similar presentations


Presentation on theme: "CITRIS Building Startup Space Committees Carlo Séquin, Gary Baldwin, Keat Saw, Scott Shackleton Design of the “Macro-Lab” February 22, 2006."— Presentation transcript:

1 CITRIS Building Startup Space Committees Carlo Séquin, Gary Baldwin, Keat Saw, Scott Shackleton Design of the “Macro-Lab” February 22, 2006

2 CITRIS Building Facilities Design 2 West View (Floors 2-7 Visible)

3 CITRIS Building Facilities Design 3 Looking South on “Engineering Esplanade”

4 CITRIS Building Facilities Design 4 CyberCafe, West Facade

5 CITRIS Building Facilities Design 5 A Few Typical Spaces Small conference room Signature conference room (sixth floor) Entrance to main auditorium Entrance corridor

6 CITRIS Building Facilities Design 6 College Entrance Level 3

7 CITRIS Building Facilities Design 7 Floorplan Level 3 to CEE Dept. (Davis Hall)

8 CITRIS Building Facilities Design 8 Main Auditorium (third floor)

9 CITRIS Building Facilities Design 9 Level 3M: NanoFab (Lower Level)

10 CITRIS Building Facilities Design 10 Level 3M: NanoFab (Lower Level)

11 CITRIS Building Facilities Design 11 Level 7

12 CITRIS Building Facilities Design 12 Floorplan Level 7

13 CITRIS Building Facilities Design 13 Level 6

14 CITRIS Building Facilities Design 14 Floorplan Level 6 to CEE Dept. (Davis Hall) to Cory Hall

15 CITRIS Building Facilities Design 15 Level 5 Entrance to Micro/Nano-Lab

16 CITRIS Building Facilities Design 16 Floorplan Level 5 Entrance to Micro/Nano-Lab

17 CITRIS Building Facilities Design 17 Level 4

18 CITRIS Building Facilities Design 18 Floorplan Level 4

19 CITRIS Building Facilities Design 19 Level 2

20 CITRIS Building Facilities Design 20 Floorplan Level 2

21 CITRIS Building Facilities Design 21 Level 1 (Basement)

22 CITRIS Building Facilities Design 22 Floorplan Level 1 (Basement)

23 CITRIS Building Facilities Design 23 Approximate Schedule  Jan 3 - Jan 31, 2006 Bid Period  Feb 27, 2006 Contract Award  Mar 15, 2006 Construction Start  Spring, 2008 Construction Completion  Summer, 2008Move In

24 CITRIS Building Facilities Design 24 MacroLab-Level 1 45x68 44x45 26x66 21x70

25 CITRIS Building Facilities Design 25 MacroLab-Level 2 75x21 32x15

26 CITRIS Building Facilities Design 26 Role of Design Committees  Help us to make the CITRIS building truly functional  Think through what should comprise the basic infrastructure  Make sure we didn’t miss anything in the infrastructure design  Help develop usage guidelines for open, collaborative research spaces  Fit-out of open office spaces for cubicle furniture  Furniture plan for key conference rooms  Specify needs for facilities fit-out for computer rooms and collaboratories  Define A/V, networking, broadcasting, and other infrastructure  Specify needs for Distance Learning Center  Help with security guidelines (e.g., space accessibility to students after 5 PM )  Content for open spaces: entrance, café, tech “museum”

27 CITRIS Building Facilities Design 27 A Few Guidelines  Successful functioning of the building heavily depends on works of these committees  CITRIS goals and mission embrace highly multi-disciplinary, collaborative research  CITRIS Headquarters serves many colleges, departments, and four UC campuses  Plan for general occupancy model of temporary space - - for the life of projects/programs only  The basic structure, both interior and exterior, is designed and fixed. We want to minimize any changes: they’re costly.  Generally, throughout the building, design for consistency in every aspect: cubicles, furniture, networking, telephony, displays, amenities, etc.  Specific goals and objectives for each committee will be distributed during the first meeting of each committee (after 1/1/06).  Meet monthly, for the first few months (approximately through Spring ’06 term). Following that, probably quarterly update.  Report quarterly  Plenary session twice each semester to review checkpoints  Have tentative design documents ready by early summer 2006  Dedicated webspace on www.citris-uc.org for document sharing, diagrams, updates, etc. To obtain access and instructions, go to: http://www.citris-uc.org/file_repositories

28 CITRIS Building Facilities Design 28 Committee Members  NanoFab Suite (fifth floor)  Bill Flounders, Costas Spanos, Arun Majumdar, Luke Lee, Eicke Weber, Per Peterson, Gary Baldwin (chair)  Macrolab Suite (Rooms 200, 201, 244 and portions of 140, 145, 148)  Alice Agogino (chair), John Canny, Kara Nelson, Ruzena Bajcsy, Karl Hedrick  Basement Laboratory (Room 145)  Kathy Yelick, Eric Brewer, Stephen Brenner, Andrew Packard, Mark Hansen, Gary Baldwin (chair)  Technology Museum  Kris Pister, Homayoun Kazerooni, Stephen Connolly, Yuri Suzuki, Jasmina Vujic, Ken Goldberg, Gary Baldwin (chair)  Classrooms 240, 250, 254 and Auditorium-related (301, 310, 306, 311, 312)  Anthony St. George, Pam Atkinson (chair), Lisa Pruitt, Dan Garcia, Paul Wright, Raja Sengupta  Computer Server Room (131)  Eric Brewer, Kathy Yelick, Jasmina Vujic, Hua Pei Chen, Gary Baldwin (chair)  Cyber Café  Dan Garcia, Alex Bayen, Kimmen Sjolander, Jose Carmena, Roberto Horowitz, Ellen Zeng (HKN), James Li (TBP), May Chu (SWE)  Members-at-large: Richard Newton, Gary Baldwin, Carlo Sequin, Scott Shakleton, Keat Saw


Download ppt "CITRIS Building Startup Space Committees Carlo Séquin, Gary Baldwin, Keat Saw, Scott Shackleton Design of the “Macro-Lab” February 22, 2006."