Presentation is loading. Please wait.

Presentation is loading. Please wait.

1 Post-Workshop Publication Community document that may be used as a reference by agencies, policy makers, leaders, scientists and engineers Breakout Group.

Similar presentations


Presentation on theme: "1 Post-Workshop Publication Community document that may be used as a reference by agencies, policy makers, leaders, scientists and engineers Breakout Group."— Presentation transcript:

1 1 Post-Workshop Publication Community document that may be used as a reference by agencies, policy makers, leaders, scientists and engineers Breakout Group Chairs will prepare (in weeks following Workshop) Report Chapters based on Breakout Group discussions and Invited Presentations Edited by George Ohring and published by NOAA

2 2 Breakout Groups and Chairs IR: Bill Emery, Joe Tansock UV, VIS, NIR: Jim Butler, Jack Xiong, Larry Flynn, Jerry Fraser Microwave: Fuzhong Weng, Karen St. Germain, Dave Kunkee Active: Dave Winker, Scott Shipley Broadband: Bruce Wielicki, Greg Kopp Intercalibration: Changyong Cao, Dave Tobin National Roadmap: Mitch Goldberg, Stephen Ungar

3 3 Goals VariableAccuracyStability (/dec) TSI 1.5 W/m 2 0.3 W/m 2 OLR 1 W/m 2 0.2 W/m 2 Net 10.3 W/m 2 UV 2% (  ind) 1% (  dep) 0.2% VIS/NIR 2%1% IR 0.1K0.01K Microwave 0.03K0.01K

4 4 Report Goals Current Status –Capabilities Pre-launch On-board Extraterrestrial Earth targets Other –Problem areas Steps to achieve goals

5 5 ASIC3 Draft Report Outline 1.Executive Summary 2.Background 3.Observational Requirements Summary 4.Calibration of Infrared Instruments 1.Current status 2.Impediments to progress 3.Recommendations to accelerate progress 5.Calibration of UV, VIS, and NIR instruments 1.Current status 2.Impediments to progress 3.Recommendations to accelerate progress 6.Calibration of microwave instruments 1.Current status 2.Impediments to progress 3.Recommendations to accelerate progress 7.Calibration of broadband instruments 1.Current status 2.Impediments to progress 3.Recommendations to accelerate progress 8.Calibration of active instruments 1.Current status 2.Impediments to progress 3.Recommendations to accelerate progress 9.Intercalibration of instruments 1.Current status 2.Impediments to progress 3.Recommendations to accelerate progress 10.National Roadmap 1.Implementation solutions 2.Coordination mechanisms 3.Agency roles


Download ppt "1 Post-Workshop Publication Community document that may be used as a reference by agencies, policy makers, leaders, scientists and engineers Breakout Group."

Similar presentations


Ads by Google