1
The CITRIS Building An Interdisciplinary IT Building (140k gsf, 80k asf, 7 stories) u Micro-Nano-fab Laboratory (20k asf) u Distance Learning Facilities u High-tech Classrooms u Interdisciplinary Research Space u A new focal point for COE Integrate with COE Master Plan
2
Sutardja-Dai Hall & Marvell Lab u A Brief review of the construction
3
Demolition of Old Davis Hall Sept. 2004
4
Excavation (next to Cory Hall) Excavation (next to Cory Hall) Dec. 2004
5
A Big Hole … 5/2005 - 7/2006
6
A Crane, 190 feet tall, Aug. 2006
7
View from the Top (Shackleton, Séquin)
8
The Steel Frame Starts to Grow Oct. 2006
9
Wall Constructions, Dec. 2006
10
Concrete Pour, Feb. 2007
11
More Steel … Much More!
12
Topping-out Ceremony, March 2, 2007 u Honoring Dean A. R. Newton ( 1951 - 2007)
13
Roof and “Penthouse” Construction
14
Hanging GFRC Facade, Aug. 2007
15
Waffle Slab for Marvell Lab, Oct. 2007
16
Topping-out the Marvell Lab, Dec. 2007
17
Marvell Lab, Jan. 2008
18
Terrace at Level 6, next to Davis Hall, Feb. 2008
19
Hoisting a Big Air Handler, Mar. 2008
20
Sutardja-Dai Hall & Marvell Lab u A look of what is going on inside
21
Level 1: Computer Room
22
Level 1: Corridor
23
Level 1: Future “Macro-Lab”
24
Level 1: Utilities under Marvell Lab
25
Level 2: Machinery under Marvell Lab
26
Level 2: Peet’s CyberCafe
27
Level 2: Distance Learning Rooms
28
Level 2: Atrium Stairs
29
Level 3: Atrium
31
Level 3: Auditorium
32
Level 3.5: Lower Marvell Lab u (Photolithography)
33
Level 3.5: Marvel Lab (Air Filtration)
34
Level 4: Carrel Space (West)
35
Level 5: Carrel Space (East)
36
Level 5: Lab Administration
37
Level 5: Upper Marvell Lab u (Diffusion Furnaces)
38
Level 6: Terrace
39
Level 6: Bridge to Cory
40
Level 6: Lounge
41
Level 6: Lounge (and view)
42
Level 6: Carrel Space (East)
43
Level 7: Carrel Space (East)
44
Level 7: Carrel Space (West)
45
Level 7: Carrel Space (East)
46
Level 8: Roof (March 2008)
47
Roof (April 2008)
48
Roof: Air-Handler Maze
49
Level 9: View of Marvell Lab Roof (Mar. 2008)
50
Marvell Micro- Nano-Lab
51
Equipment Replacement Bay
52
CITRIS Davis Hall (CEE) Cory Hall (EECS)
53
Sutardja-Dai Hall, April 10, 2008
54
Sutardja-Dai Hall: Status Summary u It is real u It is on schedule u Move-in starts January 2009 u Grand opening on March 6, 2009 u Initial occupancy is being finalized now...
55
Initial Occupancy (tentative) -- Phase 1 Move-in u F7: AI, Robotics, Machine Learning u F6: MEMS Applications, Sensors & Control u F5: Micro- & Nano- Device Technology u F4: Design, New Media, Human-Computer Interface u F3: CITRIS & GLOBE administration; Auditorium. u F2: CyberCafe, Seminar rooms, 24-7 IT room. u F1: Computer room, Macro-Lab, Motion Capture.