Upstream PID Review at CM16 A.Bross VC September 13, 2006
2
PID Review We will review the upstream PID systems (TOF 0/1 and CKOV) at CM16 Dates – October 12 and 13 The agenda will be posted on the CM WEB site and an upload area for support documents for each of the systems will be available u With Marco’s help Support documentation should be uploaded by September 29 th Format for each of the sub-systems u Overall description of systems u Cost and Schedule u Risk Analysis s See TB page for template s See Tracker Module page for an example how one group has done it u Discussion Plus simulation work, magnetic shielding and installation Review Committee u Bross (Chair), Edgecock, Murray, Soler, Virostek, Drumm (ex-officio)
3
Agenda
4
Planning for Downstream PID There are still a number of uncertainties regarding the downstream system u Transverse Size u Cal implementation (lead-fiber vs. fully active) u Funding However, we would still like to plan for a review of this system towards the end of November or early December The likely venue is INFN, Frascati More to come
Similar presentations
© 2024 SlidePlayer.com. Inc.
All rights reserved.