Workload Modeling and its Effect on Performance Evaluation Dror Feitelson Hebrew University
3
Performance Evaluation In system design –Selection of algorithms –Setting parameter values In procurement decisions –Value for money –Meet usage goals For capacity planing
4
The Good Old Days… The skies were blue The simulation results were conclusive Our scheme was better than theirs Feitelson & Jette, JSSPP 1997
5
But in their papers, Their scheme was better than ours!
6
How could they be so wrong?
7
The system’s design (What we teach in algorithms and data structures) Its implementation (What we teach in programming courses) The workload to which it is subjected The metric used in the evaluation Interactions between these factors Performance evaluation depends on:
8
The system’s design (What we teach in algorithms and data structures) Its implementation (What we teach in programming courses) The workload to which it is subjected The metric used in the evaluation Interactions between these factors Performance evaluation depends on:
9
Outline for Today Three examples of how workloads affect performance evaluation Workload modeling –Getting data –Fitting, correlations, stationarity… –Heavy tails, self similarity… Research agenda In the context of parallel job scheduling
10
Example #1 Gang Scheduling and Job Size Distribution
11
Gang What?!? Time slicing parallel jobs with coordinated context switching Ousterhout matrix Ousterhout, ICDCS 1982
12
Gang What?!? Time slicing parallel jobs with coordinated context switching Ousterhout matrix Optimization: Alternative scheduling Ousterhout, ICDCS 1982
13
Packing Jobs Use a buddy system for allocating processors Feitelson & Rudolph, Computer 1990
14
Packing Jobs Use a buddy system for allocating processors
15
Packing Jobs Use a buddy system for allocating processors
16
Packing Jobs Use a buddy system for allocating processors
17
Packing Jobs Use a buddy system for allocating processors
18
The Question: The buddy system leads to internal fragmentation But it also improves the chances of alternative scheduling, because processors are allocated in predefined groups Which effect dominates the other?
19
The Answer (part 1): Feitelson & Rudolph, JPDC 1996
20
The Answer (part 2):
23
Many small jobs Many sequential jobs Many power of two jobs Practically no jobs use full machine Conclusion: buddy system should work well
24
Verification Feitelson, JSSPP 1996
25
Example #2 Parallel Job Scheduling and Job Scaling
26
Variable Partitioning Each job gets a dedicated partition for the duration of its execution Resembles 2D bin packing Packing large jobs first should lead to better performance But what about correlation of size and runtime?
27
Scaling Models Constant work –Parallelism for speedup: Amdahl’s Law –Large first SJF Constant time –Size and runtime are uncorrelated Memory bound –Large first LJF –Full-size jobs lead to blockout Worley, SIAM JSSC 1990
28
“Scan” Algorithm Keep jobs in separate queues according to size (sizes are powers of 2) Serve the queues Round Robin, scheduling all jobs from each queue (they pack perfectly) Assuming constant work model, large jobs only block the machine for a short time But the memory bound model would lead to excessive queueing of small jobs Krueger et al., IEEE TPDS 1994
29
The Data
32
Data: SDSC Paragon, 1995/6
33
The Data Data: SDSC Paragon, 1995/6
34
The Data Data: SDSC Paragon, 1995/6
35
Conclusion Parallelism used for better results, not for faster results Constant work model is unrealistic Memory bound model is reasonable Scan algorithm will probably not perform well in practice
36
Example #3 Backfilling and User Runtime Estimation
37
Backfilling Variable partitioning can suffer from external fragmentation Backfilling optimization: move jobs forward to fill in holes in the schedule Requires knowledge of expected job runtimes
38
Variants EASY backfilling Make reservation for first queued job Conservative backfilling Make reservation for all queued jobs
39
User Runtime Estimates Lower estimates improve chance of backfilling and better response time Too low estimates run the risk of having the job killed So estimates should be accurate, right?
40
They Aren’t Mu’alem & Feitelson, IEEE TPDS 2001
41
Surprising Consequences Inaccurate estimates actually lead to improved performance Performance evaluation results may depend on the accuracy of runtime estimates –Example: EASY vs. conservative –Using different workloads –And different metrics
42
EASY vs. Conservative Using CTC SP2 workload
43
EASY vs. Conservative Using Jann workload model
44
EASY vs. Conservative Using Feitelson workload model
45
Conflicting Results Explained Jann uses accurate runtime estimates This leads to a tighter schedule EASY is not affected too much Conservative manages less backfilling of long jobs, because respects more reservations
46
Conservative is bad for the long jobs Good for short ones that are respected Conservative EASY
47
Conflicting Results Explained Response time sensitive to long jobs, which favor EASY Slowdown sensitive to short jobs, which favor conservative All this does not happen at CTC, because estimates are so loose that backfill can occur even under conservative
48
Verification Run CTC workload with accurate estimates
49
But What About My Model? Simply does not have such small long jobs
50
Workload Data Sources
51
No Data Innovative unprecedented systems –Wireless –Hand-held Use an educated guess –Self similarity –Heavy tails –Zipf distribution
52
Serendipitous Data Data may be collected for various reasons –Accounting logs –Audit logs –Debugging logs –Just-so logs Can lead to wealth of information
53
NASA Ames iPSC/860 log 42050 jobs from Oct-Dec 1993 user job nodes runtime date time user4 cmd8 32 70 11/10/93 10:13:17 user4 cmd8 32 70 11/10/93 10:19:30 user42 nqs450 32 3300 11/10/93 10:22:07 user41 cmd342 4 54 11/10/93 10:22:37 sysadmin pwd 1 6 11/10/93 10:22:42 user4 cmd8 32 60 11/10/93 10:25:42 sysadmin pwd 1 3 11/10/93 10:30:43 user41 cmd342 4 126 11/10/93 10:31:32 Feitelson & Nitzberg, JSSPP 1995
54
Distribution of Job Sizes
56
Distribution of Resource Use
58
Degree of Multiprogramming
59
System Utilization
60
Job Arrivals
61
Arriving Job Sizes
62
Distribution of Interarrival Times
63
Distribution of Runtimes
64
User Activity
65
Repeated Execution
66
Application Moldability
67
Distribution of Run Lengths
68
Predictability in Repeated Runs
69
Recurring Findings Many small and serial jobs Many power-of-two jobs Weak correlation of job size and duration Job runtimes are bounded but have CV>1 Inaccurate user runtime estimates Non-stationary arrivals (daily/weekly cycle) Power-law user activity, run lengths
70
Instrumentation Passive: snoop without interfering Active: modify the system –Collecting the data interferes with system behavior –Saving or downloading the data causes additional interference –Partial solution: model the interference
71
Data Sanitation Strange things happen Leaving them in is “safe” and “faithful” to the real data But it risks situations in which a non- representative situation dominates the evaluation results
72
Arrivals to SDSC SP2
73
Arrivals to LANL CM-5
74
Arrivals to CTC SP2
75
Arrivals to SDSC Paragon What are they doing at 3:30 AM?
76
3:30 AM Nearly every day, a set of 16 jobs are run by the same user Most probably the same set, as they typically have a similar pattern of runtimes Most probably these are administrative jobs that are executed automatically
77
Arrivals to CTC SP2
78
Arrivals to SDSC SP2
79
Arrivals to LANL CM-5
80
Arrivals to SDSC Paragon
81
Are These Outliers? These large activity outbreaks are easily distinguished from normal activity They last for several days to a few weeks They appear at intervals of several months to more than a year They are each caused by a single user! –Therefore easy to remove
83
Two Aspects In workload modeling, should you include this in the model? –In a general model, probably not –Conduct separate evaluation for special conditions (e.g. DOS attack) In evaluations using raw workload data, there is a danger of bias due to unknown special circumstances
84
Automation The idea: –Cluster daily data in based on various workload attributes –Remove days that appear alone in a cluster –Repeat The problem: –Strange behavior often spans multiple days Cirne &Berman, Wkshp Workload Charact. 2001
85
Workload Modeling
86
Statistical Modeling Identify attributes of the workload Create empirical distribution of each attribute Fit empirical distribution to create model Synthetic workload is created by sampling from the model distributions
87
Fitting by Moments Calculate model parameters to fit moments of empirical data Problem: does not fit the shape of the distribution
88
Jann et al, JSSPP 1997
89
Fitting by Moments Calculate model parameters to fit moments of empirical data Problem: does not fit the shape of the distribution Problem: very sensitive to extreme data values
90
Effect of Extreme Runtime Values Change when top records omitted omitmeanCV 0.01%-2.1%-29% 0.02%-3.0%-35% 0.04%-3.7%-39% 0.08%-4.6%-39% 0.16%-5.7%-42% 0.31%-7.1%-42% Downey & Feitelson, PER 1999
91
Alternative: Fit to Shape Maximum likelihood: what distribution parameters were most likely to lead to the given observations –Needs initial guess of functional form Phase type distributions –Construct the desired shape Goodness of fit –Kolmogorov-Smirnov: difference in CDFs –Anderson-Darling: added emphasis on tail –May need to sample observations
92
Correlations Correlation can be measured by the correlation coefficient It can be modeled by a joint distribution function Both may not be very useful
94
Correlation Coefficient systemCC CTC SP2-0.029 KTH SP20.011 SDSC SP20.145 LANL CM-50.211 SDSCParagon0.305 Gives low results for correlation of runtime and size in parallel systems
95
Distributions A restricted version of a joint distribution
96
Modeling Correlation Divide range of one attribute into sub- ranges Create a separate model of other attribute for each sub-range Models can be independent, or model parameter can depend on sub-range
97
Stationarity Problem of daily/weekly activity cycle –Not important if unit of activity is very small (network packet) –Very meaningful if unit of work is long (parallel job)
98
How to Modify the Load Multiply interarrivals or runtimes by a factor –Changes the effective length of the day Multiply machine size by a factor –Modifies packing properties Add users
99
Stationarity Problem of daily/weekly activity cycle –Not important if unit of activity is very small (network packet) –Very meaningful if unit of work is long (parallel job) Problem of new/old system –Immature workload –Leftover workload
100
Heavy Tails
101
Tail Types When a distribution has mean m, what is the distribution of samples that are larger than x? Light: expected to be smaller than x+m Memoryless: expected to be x+m Heavy: expected to be larger than x+m
102
Formal Definition Tail decays according to a power law Test: log-log complementary distribution
103
Consequences Large deviations from the mean are realistic Mass disparity –small fraction of samples responsible for large part of total mass –Most samples together account for negligible part of mass Crovella, JSSPP 2001
104
Unix File Sizes Survey, 1993
105
Unix File Sizes LLCD
106
Consequences Large deviations from the mean are realistic Mass disparity –small fraction of samples responsible for large part of total mass –Most samples together account for negligible part of mass Infinite moments –For mean is undefined –For variance is undefined Crovella, JSSPP 2001
107
Pareto Distribution With parameter the density is proportional to The expectation is then i.e. it grows with the number of samples
108
Pareto Samples
111
Effect of Samples from Tail In simulation: –A single sample may dominate results –Example: response times of processes In analysis: –Average long-term behavior may never happen in practice
112
Real Life Data samples are necessarily bounded The question is how to generalize to the model distribution –Arbitrary truncation –Lognormal or phase-type distributions –Something in between
113
Solution 1: Truncation Postulate an upper bound on the distribution Question: where to put the upper bound Probably OK for qualitative analysis May be problematic for quantitative simulations
114
Solution 2: Model the Sample Approximate the empirical distribution using a mixture of exponentials (e.g. phase- type distributions) In particular, exponential decay beyond highest sample In some cases, a lognormal distribution provides a good fit Good for mathematical analysis
115
Solution 3: Dynamic Place an upper bound on the distribution Location of bound depends on total number of samples required Example: Note: does not change during simulation
116
Self Similarity
117
The Phenomenon The whole has the same structure as certain parts Example: fractals
119
The Phenomenon The whole has the same structure as certain parts Example: fractals In workloads: burstiness at many different time scales Note: relates to a time series
120
Job Arrivals to SDSC Paragon
121
Process Arrivals to SDSC Paragon
122
Long-Range Correlation A burst of activity implies that values in the time series are correlated A burst covering a large time frame implies correlation over a long range This is contrary to assumptions about the independence of samples
123
Aggregation Replace each subsequence of m consecutive values by their mean If self-similar, the new series will have statistical properties that are similar to the original (i.e. bursty) If independent, will tend to average out
124
Poisson Arrivals
125
Tests Essentially based on the burstiness-retaining nature of aggregation Rescaled range (R/s) metric: the range (sum) of n samples as a function of n
126
R/s Metric
127
Tests Essentially based on the burstiness-retaining nature of aggregation Rescaled range (R/s) metric: the range (sum) of n samples as a function of n Variance-time metric: the variance of an aggregated time series as a function of the aggregation level
128
Variance Time Metric
129
Modeling Self Similarity Generate workload by an on-off process –During on period, generate work at steady pace –During off period to nothing On and off period lengths are heavy tailed Multiplex many such sources Leads to long-range correlation
130
Research Areas
131
Effect of Users Workload is generated by users Human users do not behave like a random sampling process –Feedback based on system performance –Repetitive working patterns
132
Feedback User population is finite Users back off when performance is inadequate Negative feedback Better system stability Need to explicitly model this behavior
133
Locality of Sampling Users display different levels of activity at different times At any given time, only a small subset of users is active
134
Active Users
135
Locality of Sampling Users display different levels of activity at different times At any given time, only a small subset of users is active These users repeatedly do the same thing Workload observed by system is not a random sample from long-term distribution
136
SDSC Paragon Data
138
Growing Variability
139
SDSC Paragon Data
141
Locality of Sampling The questions: How does this effect the results of performance evaluation? Can this be exploited by the system, e.g. by a scheduler?
142
Hierarchical Workload Models Model of user population –Modify load by adding/deleting users Model of a single user’s activity –Built-in self similarity using heavy-tailed on/off times Model of application behavior and internal structure –Capture interaction with system attributes
143
A Small Problem We don’t have data for these models Especially for user behavior such as feedback –Need interaction with cognitive scientists And for distribution of application types and their parameters –Need detailed instrumentation
144
Final Words…
145
We like to think that we design systems based on solid foundations…
146
But beware: the foundations might be unbased assumptions!
147
We should have more “science” in computer science: Collect data rather than make assumptions Run experiments under different conditions Make measurements and observations Make predictions and verify them Share data and programs to promote good practices and ensure comparability Computer Systems are Complex
148
Advice from the Experts “Science if built of facts as a house if built of stones. But a collection of facts is no more a science than a heap of stones is a house” -- Henri Poincaré
149
Advice from the Experts “Science if built of facts as a house if built of stones. But a collection of facts is no more a science than a heap of stones is a house” -- Henri Poincaré “Everything should be made as simple as possible, but not simpler” -- Albert Einstein
150
Acknowledgements Students: Ahuva Mu’alem, David Talby, Uri Lublin Larry Rudolph / MIT Data in Parallel Workloads Archive –Joefon Jann / IBM –Allen Downey / Welselley –CTC SP2 log / Steven Hotovy –SDSC Paragon log / Reagan Moore –SDSC SP2 log / Victor Hazelwood –LANL CM-5 log / Curt Canada –NASA iPSC/860 log / Bill Nitzberg
Similar presentations