The SMS project WP 5: Integration ICCS. Integration’s Role Planning: –Plan for integration of software and hardware components –Define testing needed.

Similar presentations


Presentation on theme: "The SMS project WP 5: Integration ICCS. Integration’s Role Planning: –Plan for integration of software and hardware components –Define testing needed."— Presentation transcript:

1 The SMS project WP 5: Integration ICCS

2 Integration’s Role Planning: –Plan for integration of software and hardware components –Define testing needed –Continuous interaction with the implementation WPs (i.e. WP 3 and WPs 4.1- 4.5) –Identify points of special attention Integration: –Stepwise integration of components WP 5 partners: ICCS, Siemens, AIA, Orga, RAL

3 Integration Plan Important aspects –Define what we have already as implementations –Scenarios to be supported by the integrated system –How can the different aspects be integrate: tools to use –Association with the trials environment –Necessitates work from all partners RAL –SMILE –MEM formatting and management –Navigation/localization –Contact list service –Meteo service –Flickr service –Other Internet services ULAN –Context clipboard –User interaction ICCS –SMILE –MDA tools –Service Repository –Service Authoring Wizard SBS –SMILE

4 D5.1 (due 12/07) Table of Contents 1. Introduction 1.Role of the Integration Procedure 2.Target Scenarios [optional] 2. Relation to other WPs 1.Input from WP 3 [optional] 2.Input from WP 4.1 3.Input from WP 4.2 4.Input from WP 4.3 5.Input from WP 4.4 6.Input from WP 4.5 7.Output to WP 6 3. Supporting Tools 1.Testing tools 2.Other Tools [??] 4. Integration Steps 1.Stand-alone testing 1.Step 1: End-user components 2.Step 2: Service provider components 3.Step 3: Service Authoring Wizard and Tools 2.Integration process and tests 1.Step 4: Service provider components and Authoring Tools Integration 2.Step 5: Service provider-Authoring tools and End-user components Integration 3.Step 6: Supplementary SMS System Integration and Testing 5. Integration Time Plan

5 Future Actions Define a concrete Integration plan Suggestions from all partners Preparation of Deliverable 5.1 Decision on important dates –Prepare integration: 1-2/2008 –Perform integration of existing work: 3-4/2008 –Next Deliverable: 5/2008 –Suggestions ?