Download presentation
Presentation is loading. Please wait.
1
Bagby/Mulhearn 7.26.05 L1_Cal Int/Comm Team Daily Toolbox meetings 9AM @ DAB1 u Links for updates s Schedule: Tasks for Review –http://d0server1.fnal.gov/users/bagby/www/L1_Cal/Minut es/Daily_Toolbox/Schedule.pdf s Daily Plan: Progress –http://d0server1.fnal.gov/users/bagby/www/L1_Cal/Minut es/Daily_Toolbox/Daily_Plan.pdf u Everyone at Fermilab working on L1_Cal should attend this VERY short meeting.
2
Bagby/Mulhearn 7.26.05 Status ADF TAB u Transition Parity Test write-up available by Rahmi. s http://d0server1.fnal.gov/users/bagby/www/L1_Cal/Review_D ocs/ADF_TAB_Parity.pdf u Focusing on synchronization. TAB L2/L3 u “g-link” errors to L2 resolved. s SCL/VME driver, VTM, noisy Ch0 EOFL (word error) s Now looking at GOFL (protocol errors) u Investigating VRB application firmware to establish BER. GAB L2 u No transmission errors detected.
3
Bagby/Mulhearn 7.26.05 Status WIENER EPICS u Hardware available for GUI work. Transition System u Investigating ACT FP spacing. u Several full channels tested w/MSU tester. s Establishing testing procedure. u Glenair test set-up s Card is in house. Awaiting tool for press fit connector. ORC u AC Distribution done. Working on DC.
Similar presentations
© 2025 SlidePlayer.com. Inc.
All rights reserved.