Presentation is loading. Please wait.

Presentation is loading. Please wait.

Bagby/Mulhearn 7.26.05 L1_Cal Int/Comm Team  Daily Toolbox meetings DAB1 u Links for updates s Schedule: Tasks for Review –http://d0server1.fnal.gov/users/bagby/www/L1_Cal/Minut.

Similar presentations


Presentation on theme: "Bagby/Mulhearn 7.26.05 L1_Cal Int/Comm Team  Daily Toolbox meetings DAB1 u Links for updates s Schedule: Tasks for Review –http://d0server1.fnal.gov/users/bagby/www/L1_Cal/Minut."— Presentation transcript:

1 Bagby/Mulhearn 7.26.05 L1_Cal Int/Comm Team  Daily Toolbox meetings 9AM @ DAB1 u Links for updates s Schedule: Tasks for Review –http://d0server1.fnal.gov/users/bagby/www/L1_Cal/Minut es/Daily_Toolbox/Schedule.pdf s Daily Plan: Progress –http://d0server1.fnal.gov/users/bagby/www/L1_Cal/Minut es/Daily_Toolbox/Daily_Plan.pdf u Everyone at Fermilab working on L1_Cal should attend this VERY short meeting.

2 Bagby/Mulhearn 7.26.05 Status  ADF  TAB u Transition Parity Test write-up available by Rahmi. s http://d0server1.fnal.gov/users/bagby/www/L1_Cal/Review_D ocs/ADF_TAB_Parity.pdf u Focusing on synchronization.  TAB  L2/L3 u “g-link” errors to L2 resolved. s SCL/VME driver, VTM, noisy Ch0 EOFL (word error) s Now looking at GOFL (protocol errors) u Investigating VRB application firmware to establish BER.  GAB  L2 u No transmission errors detected.

3 Bagby/Mulhearn 7.26.05 Status  WIENER  EPICS u Hardware available for GUI work.  Transition System u Investigating ACT FP spacing. u Several full channels tested w/MSU tester. s Establishing testing procedure. u Glenair test set-up s Card is in house. Awaiting tool for press fit connector.  ORC u AC Distribution done. Working on DC.


Download ppt "Bagby/Mulhearn 7.26.05 L1_Cal Int/Comm Team  Daily Toolbox meetings DAB1 u Links for updates s Schedule: Tasks for Review –http://d0server1.fnal.gov/users/bagby/www/L1_Cal/Minut."

Similar presentations


Ads by Google