1 Supply Chain Risk Management
John O’Connor Director, Global Supply Chain Management Cisco Systems, Inc.

2 Business Continuity Planning
CMs SLCs Components BCP Light BCP Cisco Regular Physical site preparedness questions in the Cisco Specific BCP Contact information, site locations, TTR & alternates BCP data including emergency contacts, primary & alternate site locations, part site mapping, and Time to Recover (TTR) Onsite crisis drills to test supplier Cisco-Specific BCPs BCP Validation BCP Light process is semi-annual Cisco – Specific BCP requests is annual for a subset of suppliers Generic BCPs are requested of remaining suppliers BCP Site Resiliency <10 suppliers < 5 suppliers > 500 suppliers

3 As I mentioned in our Vision, we want to be the leader in recovery times for our industry
This means that we need to focus on each products recovery profile that comprehends Mfg, Test Equipment and Component recovery times and drive each of those towards our goal For manufacturing this means alternate site readiness that includes an alternate that is pre-qualified and can deliver the required capacity within the TTR goal for PCBA, DF, Hub and SLC sites. In order to bring up a product at an alternate site we need to have test equipment delivered within the TTR goal, to that end we are focusing on lead time programs with key suppliers. For example, we have an agreement with on of our chamber suppliers to provide 10 pieces of equipment within 10 weeks One of the largest exposures in our component supply base, which extends to thousands of locations around the world. In order to deliver resiliency we are working with GSM to identify the parts that are the most risky and develop alternatives for manufacturing those components © 2008 Cisco Systems, Inc. All rights reserved. Cisco Confidential Presentation_ID 3

4 As I mentioned in our Vision, we want to be the leader in recovery times for our industry
This means that we need to focus on each products recovery profile that comprehends Mfg, Test Equipment and Component recovery times and drive each of those towards our goal For manufacturing this means alternate site readiness that includes an alternate that is pre-qualified and can deliver the required capacity within the TTR goal for PCBA, DF, Hub and SLC sites. In order to bring up a product at an alternate site we need to have test equipment delivered within the TTR goal, to that end we are focusing on lead time programs with key suppliers. For example, we have an agreement with on of our chamber suppliers to provide 10 pieces of equipment within 10 weeks One of the largest exposures in our component supply base, which extends to thousands of locations around the world. In order to deliver resiliency we are working with GSM to identify the parts that are the most risky and develop alternatives for manufacturing those components

5 Crisis Response: Chengdu
Customer Impact Product B Product A Product C Product D Partner Impact No Impact (CM 1, CM2, CM3, CM4) No Impact (SLC) Moderate Impact (4 suppliers) Sample disruptions that demonstrate our ability to isolate the revenue impact of a disaster regardless if it is at a supplier, CM or Cisco location. We know the products impacted as well as the recovery times Max Rev Impact TTR: XX Weeks Max/ Rev Impact: $XXM

6 Events Focus Risk: Earthquake Headquarters San Jose Risk: Earthquake
Foundries Taiwan Image NASA © 2008 Europa Technologies Image © 2008 DigitalGlobe © 2008 Tele Atlas Image NASA © 2008 Europa Technologies Image © 2008 DigitalGlobe © 2008 Tele Atlas Image NASA © 2008 Europa Technologies Image © 2008 DigitalGlobe © 2008 Tele Atlas Image NASA © 2008 Europa Technologies Image © 2008 DigitalGlobe © 2008 Tele Atlas Image NASA © 2008 Europa Technologies Image © 2008 DigitalGlobe © 2008 Tele Atlas Risk: Earthquake Single / Sole Sourced Parts Japan Risk: Typhoon & Flooding Single / Sole Sourced Parts CM concentration Hong Kong Risk: Typhoon & Flooding Highest Revenue CM Site CM site © 2007 Cisco Systems, Inc. All rights reserved. Cisco Confidential 6

7 Products Focus 50% Revenue Coverage 200 Product Families 8500 Products
Top Revenue Products 50% Revenue Coverage Top Revenue Product Families 25 Product Families 4000 Products 80% All 200 Product Families 8500 Products 100%

8 How We Deliver Resiliency: Sustaining Products
Mfg TTR Alternate site readiness Test TTR Lead-time programs and/or inventory for test equipment Component TTR 2nd source, alternate supplier site and/or inventory TTR Goals T0 T75 Weeks Time to Recover (TTR): number of weeks required to restore 100% operational output following a supply chain disruptions

9 How We Deliver Resiliency: New Products
Phase II – FY’09  How We Deliver Resiliency: New Products Product Design for Risk Supply Chain Design for Risk Comp TTR Mfg TTR Test TTR TTR-based risk rating BCP requiremnt Risk Board TTR-based SC design Risk-based bus. awards Crisis management and BCP with suppliers started prior to 2005 but were revamped when a dedicated risk team was created in 2006 Just because items have a check mark does not mean we’re done with them. All of our programs will continue to evolve even as we add new ones to scope Crisis management – defined team for managing supply chain disruptions with our suppliers and internally BCP External – Supplier BCP program BCP Internal – Business continuity mgmt program for Cisco processes & tools Substitutes – Identifying viable product substitutes for use in a SC disruption and to prioritize component risk mitigation work Component – Identifying high risk, high revenue impact parts and mitigating the risk Manufacturing -- Identifying high risk, high revenue mfg sites and mitigating the risk Test -- Identifying test equipment with long LTs and mitigating the risk Design for Risk – influencing the product design process to minimize product risk from the beginning of the product lifecycle Supply Chain for Design – incorporating risk in the SC design decision making process First Customer Ship

10 How We Measure Supply Chain Resiliency
Very Resilient Index Metrics Goal 10 1 2 3 4 5 6 7 8 9 Manufacturing Recovery X Weeks Test Recovery X Weeks Component Recovery X Weeks Single / Sole Sourced xx% Likelihood of Disruption 4 Not Resilient

11 Resiliency by Business Unit
Not Resilient Very Resilient 10 1 2 3 4 5 6 7 8 9 Not Resilient Very Resilient 10 1 2 3 4 5 6 7 8 9 Not Resilient Very Resilient 10 1 2 3 4 5 6 7 8 9 Not Resilient Very Resilient 10 1 2 3 4 5 6 7 8 9 Not Resilient Very Resilient 10 1 2 3 4 5 6 7 8 9 Relative Plot Points (see notes view) This graph was used to plot the resiliency scores to determine the relative positions on the resiliency meters.

12 Key Take Aways BCP program is a necessary foundation
Many ways to focus your risk management program – pick one! Design for Risk approach for highest impact SCRM standards needed! Crisis management and BCP with suppliers started prior to 2005 but were revamped when a dedicated risk team was created in 2006 Just because items have a check mark does not mean we’re done with them. All of our programs will continue to evolve even as we add new ones to scope Crisis management – defined team for managing supply chain disruptions with our suppliers and internally BCP External – Supplier BCP program BCP Internal – Business continuity mgmt program for Cisco processes & tools Substitutes – Identifying viable product substitutes for use in a SC disruption and to prioritize component risk mitigation work Component – Identifying high risk, high revenue impact parts and mitigating the risk Manufacturing -- Identifying high risk, high revenue mfg sites and mitigating the risk Test -- Identifying test equipment with long LTs and mitigating the risk Design for Risk – influencing the product design process to minimize product risk from the beginning of the product lifecycle Supply Chain for Design – incorporating risk in the SC design decision making process