Presentation is loading. Please wait.

Presentation is loading. Please wait.

1 Oculus Superne AAE 451 Team 2. 2 System Requirement Review Mission Overview Business Plan Customer Requirements Concept of Operations.

Similar presentations


Presentation on theme: "1 Oculus Superne AAE 451 Team 2. 2 System Requirement Review Mission Overview Business Plan Customer Requirements Concept of Operations."— Presentation transcript:

1 1 Oculus Superne AAE 451 Team 2

2 2 System Requirement Review Mission Overview Business Plan Customer Requirements Concept of Operations

3 3 Mission Statement To provide a multi-service UAS which acts as the primary detection method and facilitates a rapid response in the event of a system failure or natural disaster.

4 4 Target Market Power Line Pipeline Forest Monitoring Servicing DOT, NPS, Private energy Corporations, Foreign/Domestic Oil Companies

5 5 System Requirement Review Mission Overview Business Plan Customer Requirements Concept of Operations

6 6 Business Plan Current Unfulfilled Needs Customer Profile Benefits

7 7 Business Plan Predicted Market Potential Marketing Strategy UAV Market Source: European Civil Unmanned Air Vehicle Roadmap Vol 3 – Strategic Research Agenda 12-25-05

8 8 Business Plan Competition –Other UAVs –Manned Systems –Towers –Airships –Satellites

9 9 System Requirement Review Mission Overview Business Plan Customer Requirements Concept of Operations

10 10

11 11 QFD Overview – Customer Requirements Performance -Continuous Coverage -Autonomous Operations -Low Cost -Ease of Operation -Fast Alerts Maintenance -Low Maintenance Cost -Minimal Training

12 12 QFD Overview – Engineering Characteristics

13 13 QFD Overview – Engineering Characteristics

14 14 System Requirement Review Mission Overview Business Plan Customer Requirements Concept of Operations

15 15 Segmented Mission Profile Pipeline/Power Line 700 nm range, 1000 ft alt A B CE F G = Initial Flight = Return Flight = Ground Unit = Relay Station A-B: Take off (800 ft) B-C: Climb (4000 ft) C-D: Observe/Relay Info (1000 ft) D-E: Observe D E-F: Descend F-G: Taxi in/Relay Info G: Refuel G-F: Take off (800 ft) F-E: Climb (4000 ft) E-D: Observe/Relay Info D-C: Observe C-A: Descend/Relay Info

16 16 Multiple UAVs A B = Initial Flight = Return Flight

17 17 Forest Observation Mission Profile

18 18 Payload LIDAR (Laser Imaging Detection and Ranging) –Corridor Mapping –Land Surveying –Vegetation Growth / Density LiteMapper 5600 components Airborne Lidar Terrain Mapping System IR/Visual Camera - Thermal Imaging - Video Tracking - Detailed Pictures

19 19 Payload Current estimates representative of present technology Estimated 10% weight savings considering advances in technology Source: Optical Alchemy KJ-800

20 20 Initial Sizing Estimates based on compiled data from current UAVs Estimated Takeoff Gross Weight: 306 lbs Initial conditions for sizing iteration:

21 21 Trade Studies

22 22 GTOW vs. Payload Weight

23 23 GTOW vs. Endurance

24 24 Conclusion Mission Overview Business Plan Customer Requirements Concept of Operations

25 25 Questions?

26 26

27 27 Competitor Example MTOW 390lbs Endurance Speed 70 kts Payload Weight 80lbs Blue Horizon 2 Israeli Military Reconnaissance UAV Endurance 16hrs

28 28 Trade Studies On average, 18% of Gross Weight is Payload Weight Takeoff-Payload Weight Ration vs. Endurance


Download ppt "1 Oculus Superne AAE 451 Team 2. 2 System Requirement Review Mission Overview Business Plan Customer Requirements Concept of Operations."

Similar presentations


Ads by Google