Download presentation
Presentation is loading. Please wait.
1
M2: Team Paradigm :: Milestone 6 Update 2-D Discrete Cosine Transform Group M2: Tommy Taylor Brandon Hsiung Changshi Xiao Bongkwan Kim Project Manager: Yaping Zhan
2
M2: Team Paradigm Team Paradigm
3
M2: Team Paradigm Why were are here today... :We simulated our extracted versions of the layout with capacitances and resulted in POOR signal transfers. :To show a more precise version of our overall layout
4
M2: Team Paradigm Results :Unfortunately we were not able to figure out the problem just yet :But we will show you what little progress we tried to make
5
M2: Team Paradigm Real Results :The low output results were caused simply by not adding vdd! and gnd! pins. :Now everything is correct!
6
M2: Team Paradigm 1D-DCT Floorplan
7
M2: Team Paradigm 2D-DCT
8
M2: Team Paradigm FlipFlop Propogation Delay
9
M2: Team Paradigm FlipFlop Rise-Time
10
M2: Team Paradigm FlipFlop Fall-Time
11
M2: Team Paradigm Mirror Adder Propogation Delay delta = 3.4n
12
M2: Team Paradigm 20bit Adder Rise-Time delta = 165p
13
M2: Team Paradigm 20bit Adder Fall-Time delta = 136p
14
M2: Team Paradigm 4:1 Mux
15
M2: Team Paradigm Rising Input (Delay 124pS)
16
M2: Team Paradigm Rising input (rise time 351pS)
17
M2: Team Paradigm Rising select (Delay 157pS)
18
M2: Team Paradigm Rising select (rise time 346pS)
19
M2: Team Paradigm Falling input (delay 110pS)
20
M2: Team Paradigm Falling input (fall time 226pS)
21
M2: Team Paradigm Falling Select (delay 147pS)
22
M2: Team Paradigm Falling select (fall time 224pS)
23
M2: Team Paradigm 4 bit counter
24
M2: Team Paradigm Rising (delay 205pS)
25
M2: Team Paradigm Rising (rise time 335pS)
26
M2: Team Paradigm Falling (delay 216pS)
27
M2: Team Paradigm Falling (fall time 203pS)
28
M2: Team Paradigm ::thoughts & questions
Similar presentations
© 2025 SlidePlayer.com. Inc.
All rights reserved.