IS 788 13.11 IS 788 [Process] Change Management Lecture: Detailed look at a real-world process change case (El Sawy, Ch. 6) Presentation and Discussion – “Why Change Programs Don’t” – Lisa Anderson
2
IS 788 13.12 A semi-real process change example Based on a real-world case and modified (by IBM) for teaching purposes Two objectives Redesigning the organizations interface to the consumer Enterprise integration – better linking front and back office Both, of course, under the primary objective of better customer service leading to higher profitability
3
IS 788 13.13 Redesign as an iterative (as opposed to a waterfall) process
4
IS 788 13.14 El Sawy, p. 139 Note that this methodology includes generating specifications for IS. Explicit identification of how business partners will be effected by the process change.
5
IS 788 13.15 Process Scoping Report (phase 1) Executive summary Process performance targets (goals) Process boundaries Key process issues (problems, bottlenecks, shortcomings) Preliminary vision of new process Data collection plans for phase 2 Plus
6
IS 788 13.16 Several interesting analyses In El Sawy but not in Harmon A process SWOT An analysis of the process environment
7
IS 788 13.17 p. 95 – Poloma bank SWOT
8
IS 788 13.18 p. 96, Poloma Bank Assessment of Work Environment
9
IS 788 13.19 Zyco auto insurance Streamiline customer service process – preparatory to full ‘e’ing of the business Enhance (make easier and more profitable) their partner’s dealings with them One process of many – the auto windshield repair claims process
10
IS 788 13.110 3 sub-processes Check insurance coverage Repair shops must now call agent or Zyco and either wait for proof of coverage or proceed and risk non- payment Repair windshield Process claim and pay Possibility for fraud – customer may add coverage after windshield damage
11
IS 788 13.111 Process measures defined before implementation Performance specifications for the new process
12
IS 788 13.112 Skeleton process with its 3 subprocesses
13
IS 788 13.113 Identify problems through AS-IS modeling Information flow to partners and customers inadequate Repair shops must call insurance agent or company Customers not sure which shops are approved Internal information silos Front office and back office information sharing slow – potential for fraud
14
IS 788 13.114 Phase 2 steps Modeling the AS-IS process Analysis of problems including Interviews with process actors On site observation and analysis Measurement of key parameters in the current process
15
IS 788 13.115 Note the different cases identified in the course of measurement. This is critical – the assumption of uniform claims cases would make meaningful analysis impossible. * Best case * Worst case * Average
16
IS 788 13.116 File these with Harmon’s ‘patterns’ (from Ch. 10). Analysis heuristics to focus attention on specific common process issues.
17
IS 788 13.117 From problem identification to process improvement!
18
IS 788 13.118 Then simulate the TO-BE process.
19
IS 788 13.119 Then, the implementation Note that El Sawy is a a bit “old school” – heavy on analysis and design, but lacking any emphasis on change management. In fact El Sawy, Ch. 6 ends without a mention of change management or even implementation. (The simulation says its good, so... )
20
IS 788 13.120 A good way to end any project; summarize all the positive results: Partner Impact Report (1) Benefits to process actors, both “hard” – quantative and “soft” – qualatative Customer Shorter cycle time One-stop shopping (no need for multiple estimates) Agent No phone calls from glass shops Elimination of denials Better customer perceptions
21
IS 788 13.121 Partner Impact Report (2) Zyco Elimination of phone calls from glass shops to verify coverage Elimination of denials Added capacity Cost savings = 149K/yr Reduced fraud possibility Glass Shop No need to call insurance co/agent and wait Better customer service Less financial exposure