Presentation is loading. Please wait.

Presentation is loading. Please wait.

Team HazardHawk Team HazardHawk 2008. Last Week  Trim Budget Complete ○ Select new driveshaft, sprocket, bearings ○ Select additional component: clips.

Similar presentations


Presentation on theme: "Team HazardHawk Team HazardHawk 2008. Last Week  Trim Budget Complete ○ Select new driveshaft, sprocket, bearings ○ Select additional component: clips."— Presentation transcript:

1 Team HazardHawk Team HazardHawk 2008

2 Last Week  Trim Budget Complete ○ Select new driveshaft, sprocket, bearings ○ Select additional component: clips & clamps  HDPE Order Complete  McMaster Carr Order Complete Team HazardHawk 2008

3 Last Week  Trade Study Experiments In progress  Obtaining Electronic Components Postponed, Stocked out

4 Concept Status  Bearing & Motor mounts Strengthened by adding webs  Redesigned Arm pulley mechanism Extended the length of link 1 from 30 in. to 33 in.  Wheel selection Still in progress of finding optimum wheels (3/8 in. hub, no bearing) Team HazardHawk 2008

5 Concept Status

6 Budget

7 Trade Study Topics  Infrared Sensor Sensitivity Kerry  Kalman Filtering Techniques for Improving GPS Precision Tim  Kinematic Analysis of the Arm Mechanism Andy  GPS: Accuracy, Optimal Usage, etc. Dave  Driving Motors & Batteries Guillermo

8 Action Items  Complete Trade Studies Individual trade studies will be completed according to the schedule of key milestones proposed.  Start CNC/Machining/Prototyping CNC vehicle platform & machine drive shaft Assemble body  Obtaining Electronic Components Electronic Components (dual h-bridge & electronic compass) will be ordered online this week. Pending on Hobbystop’s inventory Team HazardHawk 2008

9


Download ppt "Team HazardHawk Team HazardHawk 2008. Last Week  Trim Budget Complete ○ Select new driveshaft, sprocket, bearings ○ Select additional component: clips."

Similar presentations


Ads by Google