Download presentation
Presentation is loading. Please wait.
1
D-ES-x-xxx Rev A 5/17/10 1 of 17 (Title) – Concept Design Review (CDR) (name) PI (name) PA Date of Review First Use Acknowledgements Image of diagnostic LLE Will Complete after the review Enter number of pages – required for PDM submittal Update logo from: /View/Master/Slide Master Establish Key Contacts Update Date from: /View/Master/Slide Master
2
D-ES-x-xxx Rev A 5/17/10 2 of 17 Overview - Motivation -Summarize Scope -Summarize Motivation Campaign Details: EP or Omega Or Joint Shot?; Campaign Type? Side Lighter/ Back Lighter? What TIM’s or Fixed?
3
D-ES-x-xxx Rev A 5/17/10 3 of 17 Requirements List Requirements Mechanical - Positioning Performance Accuracy
4
D-ES-x-xxx Rev A 5/17/10 4 of 17 Target Diagnostic Check List (Diagnostics Only) – Disclose Equipment Requirements Double Click and Edit; Items marked “Y” should show up on a slide in the presentation
5
D-ES-x-xxx Rev A 5/17/10 5 of 17 Design Concepts Approaches Issues Options Trade offs Target Diagnostic Check List Items
6
D-ES-x-xxx Rev A 5/17/10 6 of 17 P &ID – Tutorial Located on LLE Web Site 240 psi pump
7
D-ES-x-xxx Rev A 5/17/10 7 of 17 P510 Green Fiducial Omega Laser Pulse LaCave PhotoDiode TDS-694 To 15V To Scope Bias “T” Details Cabling/Connection Overview Cu Foil 527 nm 15Vdc Power N-Type
8
D-ES-x-xxx Rev A 5/17/10 8 of 17 Space Claim – Floor Plan Temporary Scopes and PS’s
9
D-ES-x-xxx Rev A 5/17/10 9 of 17 Viewing/Editing SRA – 4)This button allows the SRA to be viewed/printed/saved – Save the SRA 2) Select SRA 1) Click on your project from the project status summary to get to the LLE Project Milestones page 3)Edit page, then Select Save & Print 5)Take a screen shot of the SRA and place in presentation
10
D-ES-x-xxx Rev A 5/17/10 10 of 17 SRA
11
D-ES-x-xxx Rev A 5/17/10 11 of 17 FMEA – Each Entry on SRA requires an Entry on FMEA; additional entries can be made Double Click & Edit Enter the Line #’s into the SRA Form (Associated Risk) There must be a change in one of these two columns (Before vs After)
12
D-ES-x-xxx Rev A 5/17/10 12 of 17 Viewing EQC 2) Select EQC 1) Click on your project from the project status summary to get to the LLE Project Milestones page 3) Select “Save & Print Landscape”; Take a screen shot of each page and put in presentation (two slides)
13
D-ES-x-xxx Rev A 5/17/10 13 of 17 EQC
14
D-ES-x-xxx Rev A 5/17/10 14 of 17 EQC
15
D-ES-x-xxx Rev A 5/17/10 15 of 17 Issues - Risks
16
D-ES-x-xxx Rev A 5/17/10 16 of 17 Who does What - Assignments Resources –
17
D-ES-x-xxx Rev A 5/17/10 17 of 17 Budget (LLE Reviews Only)
Similar presentations
© 2025 SlidePlayer.com. Inc.
All rights reserved.