Team M1 Enigma Machine Milestone 9 - 3 April, 2006 Design Manager: Prateek Goenka Adithya Attawar (M11) Shilpi Chakrabarti (M12) Mike Sokolsky (M14) Design.

Similar presentations


Presentation on theme: "Team M1 Enigma Machine Milestone 9 - 3 April, 2006 Design Manager: Prateek Goenka Adithya Attawar (M11) Shilpi Chakrabarti (M12) Mike Sokolsky (M14) Design."— Presentation transcript:

1 Team M1 Enigma Machine Milestone 9 - 3 April, 2006 Design Manager: Prateek Goenka Adithya Attawar (M11) Shilpi Chakrabarti (M12) Mike Sokolsky (M14) Design Manager: Prateek Goenka

2 Status Finished: –Behavioral Verilog and C simulation –Structural Verilog –Logic optimization –Module-level spice delay and power simulations –Floorplan –Top-level schematic testing In Progress: –Functional block layout –Simulation of functional blocks To do: –Global Layout –Testing –Simulation STATUS

3 Layout done:Layout Needed: GatesROM Muxes and RegistersRAM DFF, TFF FlipflopsFSM Add_Mod26 Wheel Counter Cells Wheel Counter Serial input 3-bit and 5-bit registers

4 Design Decisions Layout of Serial in registers Layout of 3-bit and 5-bit counter cells Updated layout of Wheel Counter Floorplan

5 Initial Floorplan

6 UPDATED FLOORPLAN

7 reg3bx8serialin

8 reg3bx8_serialin

9 Wheelregs_serialin

10

11 Wheel Counter Plan (Module layout and wire planning) 5-bit Counter Cell Data from counters Wheel Select Wheel Position 5-bit Counter Cell

12 countunit

13 wheelcounter

14 Questions?