Column Flooding Michael Hickey Jason Hixson Don Scott UTC ENCH 435 11/15/05
2
Objectives Determine possible conditions that flooding may occur in the column.
3
Conditions Storage tank had approximately 36 L of 16 mole% methanol. Reflux was set at 50%. Feed pump setting and power input setting were varied.
4
Power (W)
5
Conclusion’s The risk of flooding increases significantly at the following parameters: Pump Setting 1 3000W Pump Setting 2 2700W Pump Setting 3 2500W Pump Setting 4 2250W Reboiler pressure is above 2.
6
Plans for Acme Refine reports. Prepare presentations. Next Tuesday practice our presentations on each other to give and receive critiques. Nov 29, give final presentations.