20 Nov 2008G0810007-v21 Optical & Vacuum Equipment Layouts Dennis Coyne Mike Smith Luke Williams 20 Nov 2008 Adv. LIGO Team Meeting, Caltech, Pasadena,

Similar presentations


Presentation on theme: "20 Nov 2008G0810007-v21 Optical & Vacuum Equipment Layouts Dennis Coyne Mike Smith Luke Williams 20 Nov 2008 Adv. LIGO Team Meeting, Caltech, Pasadena,"— Presentation transcript:

1 20 Nov 2008G0810007-v21 Optical & Vacuum Equipment Layouts Dennis Coyne Mike Smith Luke Williams 20 Nov 2008 Adv. LIGO Team Meeting, Caltech, Pasadena, CA

2 20 Nov 2008 G0810007-v2 2 Methodology ZEMAX and SolidWorks are key tools SolidWorks models are stored in the Adv. LIGO Project PDMWorks vault Import/export : manual or automated SOLIDWORKS OPTOMECHANICAL ENVELOPE LAYOUT ZEMAX OPTICAL LAYOUT OPTICAL LAYOUT CONSTRAINTS & REQUIREMENTS SOLIDWORKS OPTOMECHANICAL DETAIL LAYOUT SUBSYSTEM ASSEMBLIES

3 20 Nov 2008 G0810007-v2 3 Known All cavity lengths All COC and IO cavity optic positions  For each individual interferometer, H1, H2, L1 All COC and IO wedge angles, orientations and tolerances Beam dump & baffle locations

4 20 Nov 2008 G0810007-v2 4 References/Sources Zemax models SolidWorks Assemblies in the PDM Works vault:  D08xxxx_aligo_io_aos_nonfolded_layout.SLDASM  D08xxxx_aligo_io_aos_folded_layout.SLDASM References (available from the Systems wiki):  Optical Layout for Advanced LIGO, T010076-02 Defines constraints, payload element properties and rationale Will be revised for the Systems FDR (before Apr-2009)  Optic Coordinates and Cavity Lengths (for Stable Recycling Cavities), T080078-05 The definitive source – has tables with parameters & images of table layouts  Recycling Cavity Mirror Normal Vectors for H1, H2, and L1 (for Stable Recycling Cavities), T080258-00  BS, CP, and ITM Wedge Angle Tolerance, T080277-02  COC Polishing Specifications Spreadsheet To be a Table in the COC Final Design Report, E080494 The most convenient reference for COC & RC optic parameters

5 20 Nov 2008 G0810007-v2 5 Unknown or TBD Optical lever beam layouts TCS CO2 beam paths are preliminary TCS Hartmann paths are preliminary ISC Table layouts are preliminary (HAM1/7 & HAM6/12)  … and not yet integrated into the overall layout PSL/IO Table layouts are preliminary?  … and not yet integrated into the overall layout (not necessary?) H2  Layout in HAM8 is preliminary & tight – may require a move of the chamber Independent check of Zemax The PDMWorks vault is a mess!  Needs a lot of clean up for rational layout completion  Need a systematic and practical approach for layout at the full interferometer scale and at the local chamber detail scale Revised Payload Mass Properties (E040136-00)

6 20 Nov 2008 G0810007-v2 6 Vacuum Equipment (VE) Rearrangement for LHO NEW INPUT/OUTPUT MANIFOLD TUBES (4 PLACES) MOVE THE MID STATION H2 BSC CHAMBERS TO THE END STATIONS (2 PLACES) POSSIBLY LONGER H2 INPUT MANIFOLD TUBE TO RELEIVE HAM8 PAYLOAD CONJESTION

7 20 Nov 2008 G0810007-v2 7 Zemax layout examples (from T080078-05) HAM1HAM3

8 20 Nov 2008 G0810007-v2 8 Vertex Layout ITMy (BSC1) and BS (BSC2) chambers not shown HAM3 HAM4 BSC3 ITMy BS N.B.: Outriggers for the BS will be skewed from positions shown to fit to optics table.

9 20 Nov 2008 G0810007-v2 9 Input Optics Section HAM1 (ISC Readout Chamber) HAM2 HAM3 Vacuum Septum Plate New Larger Diameter Input Manifold

10 20 Nov 2008 G0810007-v2 10 PR3 PRM MC1 MC2 FI HAM2

11 20 Nov 2008 G0810007-v2 11 HAM3 MC2 PR2 FROM BS TO PR3 N.B.: Baffles are not shown.

12 20 Nov 2008 G0810007-v2 12 H1/H2 End Station New Vacuum Spools BSC-ISI Seismic Assembly, Stage-0 “ring” Support Tubes Arm Cavity Baffle Envelope ITMx, H2 Envelope ETM Transmission Telescope Envelope