20 Nov 2008G0810007-v21 Optical & Vacuum Equipment Layouts Dennis Coyne Mike Smith Luke Williams 20 Nov 2008 Adv. LIGO Team Meeting, Caltech, Pasadena, CA
2
20 Nov 2008 G0810007-v2 2 Methodology ZEMAX and SolidWorks are key tools SolidWorks models are stored in the Adv. LIGO Project PDMWorks vault Import/export : manual or automated SOLIDWORKS OPTOMECHANICAL ENVELOPE LAYOUT ZEMAX OPTICAL LAYOUT OPTICAL LAYOUT CONSTRAINTS & REQUIREMENTS SOLIDWORKS OPTOMECHANICAL DETAIL LAYOUT SUBSYSTEM ASSEMBLIES
3
20 Nov 2008 G0810007-v2 3 Known All cavity lengths All COC and IO cavity optic positions For each individual interferometer, H1, H2, L1 All COC and IO wedge angles, orientations and tolerances Beam dump & baffle locations
4
20 Nov 2008 G0810007-v2 4 References/Sources Zemax models SolidWorks Assemblies in the PDM Works vault: D08xxxx_aligo_io_aos_nonfolded_layout.SLDASM D08xxxx_aligo_io_aos_folded_layout.SLDASM References (available from the Systems wiki): Optical Layout for Advanced LIGO, T010076-02 Defines constraints, payload element properties and rationale Will be revised for the Systems FDR (before Apr-2009) Optic Coordinates and Cavity Lengths (for Stable Recycling Cavities), T080078-05 The definitive source – has tables with parameters & images of table layouts Recycling Cavity Mirror Normal Vectors for H1, H2, and L1 (for Stable Recycling Cavities), T080258-00 BS, CP, and ITM Wedge Angle Tolerance, T080277-02 COC Polishing Specifications Spreadsheet To be a Table in the COC Final Design Report, E080494 The most convenient reference for COC & RC optic parameters
5
20 Nov 2008 G0810007-v2 5 Unknown or TBD Optical lever beam layouts TCS CO2 beam paths are preliminary TCS Hartmann paths are preliminary ISC Table layouts are preliminary (HAM1/7 & HAM6/12) … and not yet integrated into the overall layout PSL/IO Table layouts are preliminary? … and not yet integrated into the overall layout (not necessary?) H2 Layout in HAM8 is preliminary & tight – may require a move of the chamber Independent check of Zemax The PDMWorks vault is a mess! Needs a lot of clean up for rational layout completion Need a systematic and practical approach for layout at the full interferometer scale and at the local chamber detail scale Revised Payload Mass Properties (E040136-00)
6
20 Nov 2008 G0810007-v2 6 Vacuum Equipment (VE) Rearrangement for LHO NEW INPUT/OUTPUT MANIFOLD TUBES (4 PLACES) MOVE THE MID STATION H2 BSC CHAMBERS TO THE END STATIONS (2 PLACES) POSSIBLY LONGER H2 INPUT MANIFOLD TUBE TO RELEIVE HAM8 PAYLOAD CONJESTION
7
20 Nov 2008 G0810007-v2 7 Zemax layout examples (from T080078-05) HAM1HAM3
8
20 Nov 2008 G0810007-v2 8 Vertex Layout ITMy (BSC1) and BS (BSC2) chambers not shown HAM3 HAM4 BSC3 ITMy BS N.B.: Outriggers for the BS will be skewed from positions shown to fit to optics table.
9
20 Nov 2008 G0810007-v2 9 Input Optics Section HAM1 (ISC Readout Chamber) HAM2 HAM3 Vacuum Septum Plate New Larger Diameter Input Manifold
10
20 Nov 2008 G0810007-v2 10 PR3 PRM MC1 MC2 FI HAM2
11
20 Nov 2008 G0810007-v2 11 HAM3 MC2 PR2 FROM BS TO PR3 N.B.: Baffles are not shown.
12
20 Nov 2008 G0810007-v2 12 H1/H2 End Station New Vacuum Spools BSC-ISI Seismic Assembly, Stage-0 “ring” Support Tubes Arm Cavity Baffle Envelope ITMx, H2 Envelope ETM Transmission Telescope Envelope